VAV TERMINAL UNITS

.carnes.com
COPYRIGHT © 2008 CARNES COMPANY
ALL RIGHTS RESERVED
20256 FORM 20256, Page 2
TABLE OF CONTENTS
Throttling Units.............................................................................................................................. 3 - 6
Fan Powered Units .................................................................................................................... 7 - 10
Electric Duct Heaters ................................................................................................................ 11 - 13
Pneumatic Pressure Dependent Controls ................................................................................ 14 - 17
Pneumatic Pressure Independent Controls .............................................................................. 18 - 25
Electric Pressure Dependent Controls...................................................................................... 26 - 27
Electric (Analog) Pressure Independent Controls .................................................................... 28 - 33
Flow Sensor and Calibration Charts ........................................................................................ 34 - 39
Replacement Parts .................................................................................................................. 40 - 47 FORM 20256, Page 3
Models AVCC, AVWD, AVEC, AKCC, AKWD, AKEC
AHCC, AHWD, AHEC, ABBD, ABWD,
ADCC and ADCD
THROTTLING
UNITS
THROTTLING UNITS FORM 20256, Page 4
INSPECT UNIT
UNPACKING
AND INSPECTION
1. Open shipping carton or crate and check for concealed
shipping damage. Report damage immediately to the carrier
that delivered the unit.
2. Inspect the unit for loose or missing components.
3. Optional accessories may be packed within the unit or in the
same shipping carton.
GENERAL
1. Each VAV unit and accessory is shipped with an
identification label showing the Carnes order number,
unit item number from the order, unit model number,
maximum and minimum CFM settings on terminal
units with pressure independent control options, and
unit tagging (or mark).
INSTALLATION
MOUNTING
1. Units are to be supported in a horizontal and level
position. For convenience, it is suggested that the
units be installed prior to installation of the ceiling tile
grid system.
2. Avoid abrupt transitions or duct turns at the inlet of the
unit that would alter the cross-section area.
3. A minimum of three duct diameters of straight duct
upstream of inlet sensor is recommended. (i.e., 6 inlet
dia. = 18 or more straight upstream duct.) Figure 1
4. Close coupling the terminal unit inlet to the side of the
main duct is NOT recommended. Figure 2
5. The control unit must be mounted such that the
velocity sensor is at the inlet of the terminal unit,
upstream of the damper blade.
6. Dual duct units may have a velocity sensor mounted
downstream at the discharge opening. The dual duct
unit should be mounted with the two inlets upstream of
the damper blades.
7. The diameter of the inlet duct in inches must be equal
to the listed inlet collar diameter of the terminal unit.
8. A minimum clearance of six inches (6) is required at
the top discharge opening (by-pass) on Models ABB
and ABW.
9. All control enclosures require adequate clearance to
allow for field adjustments and service.
10. Terminal units may be provided with optional hanger
brackets which are suitable for supporting the terminal
unit by wire hangers or threaded rods.
11. Strap hangers may be used for supporting the units
when hanger brackets are not provided.
CAUTION: Do not install hangers so as to impair the
movement or performance of control
components.
CAUTION: Do not install hangers with screws into
the uninsulated coil casing. Permanent
coil damage may result.
CAUTION: Do not install hangers so as to impair or
restrict the movement of the slide
balancing damper on By-Pass terminal
units. (Models ABB & ABW).
Figure 1
Figure 2
CARNES COMPANY, VERONA, WI
ORDER
ITEM
MODEL
MAX. CFM/MIN. CFM
MARK
STRAIGHT DUCT UPSTREAM
CLOSE COUPLING NOT RECOMMENDED
THROTTLING UNITS FORM 20256, Page 5
DUCT CONNECTIONS
1. Units are provided with slip and drive discharge duct
connections.
2. It is suggested that discharge ductwork be lined with
a minimum of 1/2 thick, 1-1/2 lb. density fiberglass
insulation with an erosion resistant surface in
accordance with NFPA 90A (non-residential type air
conditioning and ventilating systems) to provide both
thermal and acoustical insulation.
3. Multi-discharge adaptors and attenuators are field
mounted with slip and drive cleats provided by others.
4. Multi-discharge adaptors have round duct collars
designed for easy connections to commercial
insulated flex duct by others.
5. Each multi-discharge adaptor outlet is equipped with
an airflow balancing damper. Balancing damper does
not provide full shut off.
6. Sealing of duct work to preclude air leaks should be
done in accordance with the job specifications.
7. It is recommended that flexible ductwork connected to
the inlet be secured using compression band. Rigid
duct should be slipped over the inlet, secured in place
with sheet metal screws, and sealed in accordance
with the job specifications.
BALANCING THE MODELS ABB and ABW
BY-PASS TERMINAL UNITS
I. SYSTEM BALANCING
Prior to setting design flow conditions at each unit the by-
pass slide dampers must be balanced against downstream
duct resistance.
1. Adjust all thermostats for full cooling so that there is a
maximum air flow to the zone.
2. Using the two air flow pressure taps at each unit, green
(high pressure) and yellow (low pressure), read and
record the air flow pressure to the zone (this value may
be in excess of design flow requirements).
3. After this reading has been taken, adjust the
thermostat for full heat (full by-pass position).
4. When unit is in full by-pass position, adjust the by-pass
slide damper so that the pressure reading is the same
as it was for full cooling to the zone.
5. Continue this procedure at each ABB and ABW unit.
II. SYSTEM DESIGN FLOWS
Once the by-pass slide dampers have been balanced, then
the zone design flow conditions can be set.
1. Again, adjust zone thermostats to full cool (maximum
air flow to the zone).
2. Adjust actuator to the maximum CFM as measured at
the diffusers.
3. Adjust zone thermostat to full heat (minimum air flow to
zone).
4. Adjust actuator to the minimum CFM as measured at
the diffusers.
5. Continue this procedure at each ABB and ABW unit.
HOT WATER COIL
FIELD or FACTORY
MOUNTED
BASIC UNIT
BASIC UNIT
(Model ABB)
HOT WATER COIL TUBING CONNECTIONS
ARE LOCATED ON CONTROL SIDE OF
TERMINAL UNIT
SINGLE DUCT
DUAL DUCT
BY-PASS
BASIC UNIT
(Model ADC)
ATTENUATOR, MULTI-DISCHARGE
ADAPTOR or RECTANGULAR
DUCT (All Field Mounted)
HOT WATER COIL, 1 or 2 ROW
FACTORY MOUNTED
(Model ABW)
6 MINIMUM VERTICAL
CLEARANCE
ATTENUATOR
MULTI-DISCHARGE
ADAPTOR or
RECTANGULAR DUCT
(All Field Mounted)
THROTTLING UNITS
SINGLE DUCT WITH ELECTRIC REHEAT
ATTENUATOR,
MULTI-DISCHARGE
ADAPTOR or
RECTANGULAR
DUCT (All Field
Mounted)
ATTENUATOR, MULTI-
DISCHARGE ADAPTOR
or RECTANGULAR
DUCT (All Field Mounted)
BASIC UNIT
ELECTRIC HEATER CONTROL
PANEL IS LOCATED ON CONTROL
SIDE OF TERMINAL UNIT FORM 20256, Page 6
HOT WATER COIL CONNECTIONS
ELECTRIC DUCT HEATER CONNECTIONS
ELECTRICAL CONNECTIONS
Hot water coils are factory mounted to the control unit with
coil connections on the same side of the terminal units as
the damper controls.
1. Hot water coil casings are uninsulated. Insulation
requirements must be field applied with material
supplied by others.
2. Water supply valve should be installed on the bottom
coil connection. (Coil shall fill from the bottom.)
Electric duct heaters may be shipped attached or loose
from the terminal unit.
1. When shipped factory mounted to the terminal unit, the
electric heater control panel is on the same side of the
terminal unit as the damper controls.
2. When shipped loose for field mounting, the electric
heater should be mounted as indicated by the AIR-
FLOW arrow and the UP arrow on the electric
heater control panel cover.
3. Electric duct heater casings are uninsulated. Insulation
requirements must be field applied with material
supplied by others.
1. Electric duct heater wiring should be done in
accordance with local codes and job specifications.
2. Follow the wiring/piping diagram found on the side of
the unit or the inside of the electric heater control
panel cover.
3. Supply connections must be made using wires rated
for 75°C minimum. DO NOT USE ALUMINUM
CONDUCTORS.
4. If supply connections are for 250 volts or greater, all
wiring must be insulated for 600V.
5. All field and factory made connections should be
checked for tightness before operation.
6. Size wiring conductors for 125% of rated combined
load.
Single Phase
KW x 1000
Line Current
=
Voltage
Three Phase
KW x 1000
Line Current
=
1.73 x Voltage
7. The following table shows the maximum current for
the supply overcurrent protection device.
Maximum
Maximum Overcurrent
Unit Amperage
Device Rating
12
15
16
20
20
25
24
30
28
35
32
40
36
45
40
50
48
60
3. Coil tubes are suitable for sweat connections to the
field water pipe system.
4. Hot water coils may be reversed in the field by
removing the slip and drive cleats and rotating the coil
water connections to the other side and reinstalling the
slip and drive cleats.
CAUTION: Plumbing heat sink methods should be used
when soldering near existing joints.
CAUTION: Do not mount electric heaters upside down.
Heater will not func