ELECTRICAL TESTING
For 14KV 240KV GENERATORS
TECHNICAL SPECIFICATIONS
SCOPE
Electrical Testing. To perform Testing as required
and as requested by Seattle City Light, to include providing highly skilled Relay Technicians to perform
final programming and setpoint modifications to new protective relay
installations along with performing quality control (QC) checks of the
associated circitry. Perform routine testing procedures on 3-phase 14KV
240KV main generator step-up transformers and 240KV power circuit
breakers including power fractor (Doble), timing and turn-to-turn ratio
testing and ductor and relay maintenance and testings on a periodic
basis.
The following Section Four is an excerpt from Boundary Generators/Lines
51-54 Microprocessor Relays Manual. It is included here for the purposes
of identifying the testing and commissioning procedures required of
the successful proposer upon issuance of a vendor contract. Each proposer
is required by this specification to acknowledge receipt of Section
Four and acknowledgement that they know and understand the procedures
required by the City of Seattle for Electrical Testing.
Test and Commissioning Procedures
Scope
This test procedure is intended for use by trained
electrical workers and protective relay test personnel.
It is assumed herein that journey level qualified
persons will read and use this test procedure.
It is not intended that this document be used as
a training guide for those inexperienced in the work. The terminology
and information presented is not sufficiently detailed for that purpose.
Table of Drawings
The table below lists all drawings required for performing
testing and commissioning of the relay system. These drawings will be
referred to by item number from the table
in the text.
The drawings listed are for Generators and Lines 51-54. Other than
the drawing numbers referred to, there are no differences in the test
procedure for Units 51-54, unless specifically noted herein.
#
Title Summary
Unit 51
Unit 52
Unit 53
Unit 54
1
BPA Bus Differential Elementary
C6677
C6677
C6677
C6677
2
UCB Connection Diagram Pnl R1
D19392-1
D19392-2
D19392-3
D19392-4
3
Unit 51 AC Elementary
D23560
D23600
D23640
D23680
4
Auto Start Stop DC Elementary
D23565
D23605
D23645
D23685
5
Shutdown Device DC Elementary
D23566
D23606
D23646
D23686
6
Excitation Control DC Elementary
D23570
D23610
D23650
D23690
7
Annunciator Elementary
D23573
D23613
D23653
D23693
8
Breaker DC (System) Elementary
D23581
D23621
D23661
D24260
9
Control Relay Board Plan/Elevation
D23594-1
D23594-2
D23594-3
D23594-3
10
Gen & Excitation Connection Diagram
D24230
D24240
D24250
D24260
11
Terminal Connection Diag Pnl R1
D24235
D24245
D24255
D24265
12
Unit Terminal Connection Diagram
D24236
D24246
D24256
D24266
13
Breaker External Connection Diagram
D24238
D24248
D24258
D24268
14
Load Drop Pnl Connection Diagram
D32078
D32078
D32078
D32078
15
UCB Relays Pnl R3 Connection Diagram (Partial
R3)
D34540
D35206
D36080
---------
16
UCB Relays Pnl R2 Connection Diagram (Partial
R2)
D34541
D35207
D36081
---------
17
Relay Inputs/Outputs DC Elementary
D34542
D35208
D36082
---------
18
311C Logic Diagram (Substation)
D34543
D35639
D36083
---------
19
311C Logic Diagram (Powerhouse)
D34544
D35640
D36084
---------
20
300G Logic Diagram (Powerhouse)
D34545
D35641
D36085
---------
21
Rack Y3/Y4 Connection Diagram
D35205
D35206
D35207
---------
22
Rack Y3/Y4 Terminal Boards Connection Diagram
D35261
D35261
D35261
D36071
23
Excitation Cubicle Connection Diagram
MD2455
MD2455
MD2455
MD2455
24
Panel Y1 Connection Diagram
MD2683