ELECTRICAL TESTING
For 14KV 240KV GENERATORS
TECHNICAL SPECIFICATIONS

SCOPE


Electrical Testing. To perform Testing as required
and as requested by Seattle City Light, to include providing highly skilled Relay Technicians to perform
final programming and setpoint modifications to new protective relay
installations along with performing quality control (QC) checks of the
associated circitry. Perform routine testing procedures on 3-phase 14KV
240KV main generator step-up transformers and 240KV power circuit
breakers including power fractor (Doble), timing and turn-to-turn ratio
testing and ductor and relay maintenance and testings on a periodic
basis.


The following Section Four is an excerpt from Boundary Generators/Lines
51-54 Microprocessor Relays Manual. It is included here for the purposes
of identifying the testing and commissioning procedures required of
the successful proposer upon issuance of a vendor contract. Each proposer
is required by this specification to acknowledge receipt of Section
Four and acknowledgement that they know and understand the procedures
required by the City of Seattle for Electrical Testing.


Test and Commissioning Procedures
Scope

This test procedure is intended for use by trained
electrical workers and protective relay test personnel.


It is assumed herein that journey level qualified
persons will read and use this test procedure.


It is not intended that this document be used as
a training guide for those inexperienced in the work. The terminology
and information presented is not sufficiently detailed for that purpose.


Table of Drawings

The table below lists all drawings required for performing
testing and commissioning of the relay system. These drawings will be
referred to by item number from the table
in the text.


The drawings listed are for Generators and Lines 51-54. Other than
the drawing numbers referred to, there are no differences in the test
procedure for Units 51-54, unless specifically noted herein.


 






#


Title Summary


Unit 51


Unit 52


Unit 53


Unit 54


1


BPA Bus Differential Elementary


C6677


C6677


C6677


C6677


2


UCB Connection Diagram Pnl R1


D19392-1


D19392-2


D19392-3


D19392-4


3


Unit 51 AC Elementary


D23560


D23600


D23640


D23680


4


Auto Start Stop DC Elementary


D23565


D23605


D23645


D23685


5


Shutdown Device DC Elementary


D23566


D23606


D23646


D23686


6


Excitation Control DC Elementary


D23570


D23610


D23650


D23690


7


Annunciator Elementary


D23573


D23613


D23653


D23693


8


Breaker DC (System) Elementary


D23581


D23621


D23661


D24260


9


Control Relay Board Plan/Elevation


D23594-1


D23594-2


D23594-3


D23594-3


10


Gen & Excitation Connection Diagram


D24230


D24240


D24250


D24260


11


Terminal Connection Diag Pnl R1


D24235


D24245


D24255


D24265


12


Unit Terminal Connection Diagram


D24236


D24246


D24256


D24266


13


Breaker External Connection Diagram


D24238


D24248


D24258


D24268


14


Load Drop Pnl Connection Diagram


D32078


D32078


D32078


D32078


15


UCB Relays Pnl R3 Connection Diagram (Partial
R3)


D34540


D35206


D36080


---------


16


UCB Relays Pnl R2 Connection Diagram (Partial
R2)


D34541


D35207


D36081


---------


17


Relay Inputs/Outputs DC Elementary


D34542


D35208


D36082


---------


18


311C Logic Diagram (Substation)


D34543


D35639


D36083


---------


19


311C Logic Diagram (Powerhouse)


D34544


D35640


D36084


---------


20


300G Logic Diagram (Powerhouse)


D34545


D35641


D36085


---------


21


Rack Y3/Y4 Connection Diagram


D35205


D35206


D35207


---------


22


Rack Y3/Y4 Terminal Boards Connection Diagram


D35261


D35261


D35261


D36071


23


Excitation Cubicle Connection Diagram


MD2455


MD2455


MD2455


MD2455


24


Panel Y1 Connection Diagram


MD2683