SECTION 700 MISCELLANEOUS CONSTRUCTION

IPTION
704.02 MATERIALS AND EQUIPMENT
A. Sign Backing Materials
B. Reflective Sheeting
C. Flexible Roll-Up Sign
D. Flat Sheet Sign Faces
E. Barricades
1. Wood Rails
2. Aluminum Rails
F. Delineator Drums
G. Traffic Cones
H. Tubular Markers
I.
Vertical Panels
J.
Delineators
K. Portable Barriers
L. Warning Lights
M. Advanced Warning Flashing or Sequencing Arrow Panels
N. High-Level Warning Device
O. Short-Term Construction Zone Marking and Short-Term Pavement
Marking
P.
Flagging
Q. Pilot Car
704.03 CONSTRUCTION REQUIREMENTS
A. General
B. Project Terminal Signing
C. Work Area Signing
D. Existing Signs
E. Route Markers
F. Detour Signing
G. Highways Closed to Traffic
H. Restricted Speed Zones
I.
Temporary Suspension
J.
Barricade Application
K. Drum Application
L. Traffic Cone and Tabular Marker Application
M. Flexible Delineator Application
N. Vertical Panel Application
O. Delineator Application
P.
Portable Barrier Application
Q. Lighting Device Application
1. Type III or IV Reflective Sheeting 378
2. Flashing Lights (Type A, Low-Intensity)
3. Flashing Lights (Type B, Hi-Intensity)
4. Steady-Burn Lights (Type C)
5. Mounting Height of Warning Lights
a. Barricade and Portable Standards
b.
Signs
c. Vertical Channelizing Devices and Independent Supports
6. Advance Warning Arrow Panels
7. Floodlights
R. High-Level Warning Device
S. Pavement Marking Removal
T. Construction Zone Marking
U. Traffic Control Personnel
1. Traffic Control Supervisor
a. Qualifications
b. Duties
c. Traffic Control Course
2. Watchpersons
V. Emergency Control
W. Maintenance of Traffic Control Devices
X. Flagging
Y. Pilot Car
Z. Flag Application
704.04 METHOD OF MEASUREMENT
704.05 BASIS OF PAYMENT
SECTION 706
FIELD LABORATORY
706.01 DESCRIPTION
706.02 REQUIREMENTS
A. Type A, Field Laboratory
B. Type B, Field Laboratory
C. Type C, Field Laboratory
706.03 METHOD OF MEASUREMENT
706.04 BASIS OF PAYMENT
SECTION 708
EROSION CONTROL
708.01 DESCRIPTION
708.02 SEEDING, SODDING, AND MULCHING
A. Description
B. Materials
1. Seeding
a. General
b. Seed Testing 379
c. Labeling
d. Seed Classes
e. Fertilizer Requirements
2. Sodding
a. General
b. Peat Sod
c. Sampling, Testing, and Certification
3. Mulching
a. Hydro Mulching
b. Straw Mulching
c. SS-1 Emulsion
C. Construction Requirements
1. Seeding
a. General
b. Topsoil
c. Types of Seedbed Preparation
d. Seasonal Limitations
e. Seeding Equipment Requirements
f.
Fertilizer
g. Reseeding and Repair
h. Temporary Care
2. Sodding
a. Preparation of the Earth Bed
b. Placing the Sod
c. Staking the Sod
d. Clean-Up
e. Fertilizer
f.
Care and Maintenance
g. Acceptance
3. Hydro-Mulch
4. Straw or Hay Mulching
a. General
b. Equipment
c. Application
d. Anchoring
e. Temporary Maintenance
D. Method of Measurement
E. Basis of Payment
708.03 SOIL RETENTION BLANKET
A. Description
B. Materials
C. Construction Requirements
1. Wood Excelsior or Fiber Mat
2. Erosion Control Fabric
3. Fiberglass Roving
4. Repair of Soil Retention Blanket
D. Method of Measurement
E. Basis of Payment
708.04 RIPRAP AND AGGREGATE CUSHION
A. Description
B. Materials
1. Wire Mesh
2. Grout 380
3. Riprap
a. Gradation
b. Field Stone
c. Quarry Stone
4. Aggregate Cushion
C. Construction Requirements
1. General
2. Aggregate Cushion
3. Wire Mesh Riprap
4. Loose Rock Riprap
D. Method of Measurement
E. Basis of Payment
708.05 FABRIC FORMED SLOPE PROTECTION
A. Description
B. Materials
C. Construction Requirements
D. Method of Measurement
E. Basis of Payment
708.06 CONCRETE SLOPE PROTECTION
A. Description
B. Materials
C. Construction Requirements
1. Preparation of Subgrade
2. Placing Reinforcement
3. Composition of Concrete
4. Placing Concrete
5. Relief Joints
6. Finishing Concrete
7. Curing Concrete
8. Tests on Concrete
D. Method of Measurement
E. Basis of Payment
SECTION 709
GEOTEXTILE FABRICS
709.01 DESCRIPTION
709.02 MATERIALS
709.03 CONSTRUCTION REQUIREMENTS
A. General
B. Geotextile Separation Fabric
C. Filter Fabric (Underdrains)
D. Filter Fabric (Riprap)
E. Geotextile Reinforcement Fabric
709.04 METHOD OF MEASUREMENT
709.05 BASIS OF PAYMENT
SECTION 710
TEMPORARY BYPASS
710.01 DESCRIPTION 381
710.02 CONSTRUCTION REQUIREMENTS
710.03 METHOD OF MEASUREMENT
710.04 BASIS OF PAYMENT
SECTION 714
CULVERTS, STORM DRAINS, EDGE DRAINS,
AND UNDERDRAINS
714.01 DESCRIPTION
714.02 MATERIALS
A. Culverts and Storm Drains
B. Smooth Wall Steel Pipe Culverts
C. Underdrains
D. Bridge Approach Drains
E. Edge Drains
714.03 CONSTRUCTION REQUIREMENTS
A. Culverts and Storm Drains
1.
Excavation
2. Bedding
3. Laying Pipe
4. Joining Pipe
5. Relaid Pipe
6. Backfilling for Pipe Installed in Embankments
7. Backfilling for Pipe Installed in Trenches
8. Imperfect Trench Method of Installation
B. Smooth Wall Pipe Culvert
C. Underdrains
D. Bridge Approach Drains
E. Edge Drains
714.04 METHOD OF MEASUREMENT
714.05 BASIS OF PAYMENT
SECTION 720
MONUMENTS AND RIGHT OF WAY MARKERS
720.01 DESCRIPTION
720.02 MATERIALS
720.03 CONSTRUCTION REQUIREMENTS
A. Monuments
B. Right of Way Markers
720.04 METHOD OF MEASUREMENT
720.05 BASIS OF PAYMENT
SECTION 722
MANHOLES, CATCH BASINS, AND INLETS
722.01 DESCRIPTION 382
722.02 MATERIALS
722.03 CONSTRUCTION REQUIREMENTS
A. Excavation
B. Brick Masonry Construction
C. Precast Concrete Masonry Units
D. Precast RCP Manholes, Inlets, and Catch Basins
E. Concrete Construction (Cast-in-Place)
F. Concrete Base (Pre-cast or Cast-in-Place)
G. Pipe Connections
H. Reinforcement
I.
Placing Castings
J.
Backfill
K. Cleaning
L. Adjustments to Existing Units
722.04 METHOD OF MEASUREMENT
722.05 BASIS OF PAYMENT
SECTION 724
WATER MAINS, WATER LINES, AND SEWER LINES
724.01 DESCRIPTION
724.02 MATERIALS
A. Pipes
B. Joints and Fittings
C. Rubber Gaskets
D. Gate Valves
E. Butterfly Valves
F. Valve Boxes
G. Hydrants
H. Tapping Saddle and Tapping Valve or Tapping Sleeve and Tapping Valve
I.
Aggregates
J.
Concrete
K. Corporation Stops (Cocks), Curb Stops, and Curb Boxes
724.03 CONSTRUCTION REQUIREMENTS
A. General
B. Excavation and Trenching
1. Excavation
2. Bedding
3. Backfilling
C. Water Main Requirements
1. Laying Water Mains
2. Testing and Disinfecting Lines
3. Thrust Blocks
4. Hydrants
5. Reset Hydrant
6. Backfill
7. Marking Tape
D. Water and Service Lines
1. General 383
2. Laying Water Line
3. Testing
E. Sanitary Sewer Pipe Requirements
724.04 METHOD OF MEASUREMENT
724.05 BASIS OF PAYMENT
SECTION 740
DAMPPROOFING AND FABRIC WATERPROOFING
740.01 DESCRIPTION
740.02 MATERIALS
740.03 CONSTRUCTION REQUIREMENTS
A. General
B. Dampproofing
C. Fabric Waterproofing
D. Black Polyethylene Membrane
740.04 METHOD OF MEASUREMENT
740.05 BASIS OF PAYMENT
SECTION 744
INSULATION BOARD (POLYSTYRENE)
744.01 DESCRIPTION
744.02 MATERIALS
744.03 CONSTRUCTION REQUIREMENTS
A. Subgrade Preparation
B. Installation
C. Cover Material
D. Traffic
744.04 METHOD OF MEASUREMENT
744.05 BASIS OF PAYMENT
SECTION 748
CURB AND GUTTER
748.01 DESCRIPTION
748.02 MATERIALS
748.03 CONSTRUCTION REQUIREMENTS
A. Cast-in-Place Concrete Curb and Gutter
1. Equipment
2. Excavation 384
3. Base
4. Mixing, Placing, and Finishing
5. Joints and Joint Sealing
6. Curing
7. Backfill
8. Operational Limits
B. Precast Concrete Curbing
1. Excavation
2. Base
3. Installation
4. Surface Finish
5. Joints
6. Backfill
C. Bituminous Curbing
1. Excavation
2. Base
3. Preparation of Bed
4. Placing
5. Painting and Sealing
6. Backfill
748.04 METHOD OF MEASUREMENT
748.05 BASIS OF PAYMENT
SECTION 750
SIDEWALKS AND DRIVEWAYS
750.01 DESCRIPTION
750.02 MATERIALS
750.03 CONSTRUCTION REQUIREMENTS
A. Forms
B. Excavation
C. Base
D. Placing Concrete
E. Finishing
F. Joints
G. Curing
H. Backfill
I.
Operational Limits
750.04 METHOD OF MEASUREMENT
750.05 BASIS OF PAYMENT
SECTION 752
FENCING -- INSTALLATION AND RESETTING
752.01 DESCRIPTION
752.02 MATERIALS 385
752.03 CONSTRUCTION REQUIREMENTS
A. General
B. Installing Line Posts
C. Corner and Brace Assemblies
D. Installing Fence Wire
1. Barbed Wire and Woven Wire
2. Chain Link Fence
E. Gates
F. Resetting Fences
752.04 METHOD OF MEASUREMENT
752.05 BASIS OF PAYMENT
SECTION 754
HIGHWAY SIGNS
754.01 DESCRIPTION
754.02 MATERIALS
A. General
B. Concrete
C. Reinforcing Steel
D. Delineators
E. Hardware and Fittings
F. Overhead Sign Structures
G. Posts
754.03 CONSTRUCTION REQUIREMENTS
A. Locating and Positioning Signs and Sign Structures
B. Sign Fabrication
1. General
2. Fabrication of Sign Backing
3. Cleaning and Processing
4. Fabrication of Flat Sheet Signs
5. Fabrication of Panel Signs
6. Date of Fabrication
C. Packaging, Labeling, Handling, and Shipping
D. Label (Handling, Storage, and Installation Instructions)
1. Loading on Vehicles
2. Storage at Job Site
3. Installation
E. Erection of Sign Supports and Delineators
1. General
2. Delineator Posts
3. Anchor for Telescoping Perforated Tubes and Flange Channel Sup-
ports
4. Tubular Sign Supports
5. Overhead Sign Structures
6. Splicing
7. W-Shaped Sign Supports
F. Mounting Flat Sheet Signs Type III A and III B Sheeting
G. Removing and Resetting Signs and Supports
H. Remove Sign Foundations 386
I.
Revise Fuse Joints
J.
Overlay Panel Sign Refacing
K. Auxiliary Signs
754.04 METHOD OF MEASUREMENT
754.05 BASIS OF PAYMENT
SECTION 762
PAVEMENT MARKING
762.01 DESCRIPTION
762.02 MATERIALS
762.03 EQUIPMENT
762.04 CONSTRUCTION REQUIREMENTS
A. General
B. Pavement Surface Preparation
1. General
2. Plastic Pavement Marking Film
3. Preformed Patterned Pavement Marking Film
4. Pavement Marking Paint
5. Short-Term Pavement Marking
C. Traffic Control
1. Signing
2. Traffic Movement
3. Time Period for Control
4. Operational Precautions
D. Pavement Marking Application
1. Pav