www.boeing.com/companyoffices/doingbiz/anaheim/flysheets/pqa/1D75008.doc
=white>
AN-38A
Supplier Product Inspection
Report
In accordance with Code 3
requirements of the purchase order and this flysheet, Seller shall
provide to Buyer, inspection data of product characteristics specified
below.
Note:
Seller may submit its own Inspection Data Report format providing the
information and inspection data requirements set forth here in are met.
Supplier Product Inspection
Report
Date: 11-22-99
Purchase Order: various
Part Number: 1D75008-1
Rev. Ltr. B
(Above information
to be completed by Seller)
Prepared by:_L. Dolsen
(To be completed
by PQE)
Remarks: The supplier
shall submit testing results of the below requirement either on this
form or their form with evidence of QA concurrence.
Drawing or Specification
Requirements
Suppliers Measurement
Evidence of Suppliers Inspection
Dwg note 3: Proof test
to 100+/-10 PSIG for five minutes minimum. No leakage or permanent deformation
allowed.
Supplier
Note: If the drawing revision level does not match the revision
level noted on this sheet, notify the buyer immediately for a new AN38A
IOD - 173-040, rev A. 10/29/97