Madhya Pradesh Power Sector Development Program
org/Documents/PCRs/IND/29473-IND-PCR.pdf. It's a snapshot of the page taken as our search engine crawled the Web.
The web site itself may have changed. You can check the current page or check for previous versions at the Internet Archive.
Yahoo! is not affiliated with the authors of this page or responsible for its content.
Madhya Pradesh Power Sector Development Program
Completion Report
Completion Report
Project Number: 29473
Loan Numbers: 1868 and 1869
June 2008
India: Madhya Pradesh Power Sector Development
Program
CURRENCY EQUIVALENTS
Currency Unit
Indian rupee/s (Re/Rs)
At Appraisal
At Project
Completion
(1 November 2001) (as of 3 April 2007)
Re1.00
=
$0.0208
$0.023
$1.00
=
Rs47.98
Rs43.29
ABBREVIATIONS
ADB
Asian Development Bank
CIDA
Canadian International Development Agency
DFID
Department for International Development
EA
executing agency
EIRR
economic internal rate of return
FIRR
financial internal rate of return
FRP
financial restructuring plan
IDC
interest during construction
MPERC
Madhya Pradesh Electricity Regulatory Commission
MPSEB
Madhya Pradesh State Electricity Board
PMU
project management unit
SDP
sector development project
SGIA
second generation imprest account
TA
technical assistance
WACC
weighted average cost of capital
WEIGHTS AND MEASURES
GWh
gigawatt-hour (1,000 megawatt-hours)
Hz
hertz (frequency, cycles per second)
kV
kilovolt (1,000 volts)
kVA
kilovolt-amperes (1,000 watts)
kWh
kilowatt-hour (1,000 watt-hours)
kW
kilowatt (1,000 W)
MVA
megavolt-amperes (1 million watts)
MW
megawatt (1,000 kW)
MWh
megawatt-hour (1,000 kilowatt-hours)
W
watt (unit of active power)
NOTES
(i)
The fiscal year (FY) of the Government ends on 31 March. FY before a calendar year
denotes the year in which the fiscal year ends, e.g., FY2008 ends on 31 March 2008.
(ii)
In this report, "$" refers to US dollars.
Vice President
L. Jin, Operations 1
Director General
K. Senga, South Asia Department (SARD)
Director
T. Kondo, India Resident Mission (INRM), SARD
Team leader
V.Rao Karbar, Senior Project Implementation Officer (Energy), INRM, SARD
Team member
M. Gomes, Assistant Project Analyst, INRM, SARD
CONTENTS
Page
BASIC DATA
i
MAP
vii
I.
PROGRAM DESCRIPTION
1
II.
EVALUATION OF DESIGN AND IMPLEMENTATION
2
A.
Relevance of Design and Formulation
2
B.
Program Outputs
3
C.
Program Costs
5
D.
Disbursements
6
E.
Program Schedule
6
F.
Implementation Arrangements
7
G.
Conditions and Covenants
8
H.
Related Technical Assistance
8
I.
Consultant Recruitment and Procurement
8
J.
Performance of Consultants, Contractors, and Suppliers
8
K.
Performance of the Borrower and the Executing Agency
9
L.
Performance of the Asian Development Bank
9
III.
EVALUATION OF PERFORMANCE
9
A.
Relevance
9
B.
Effectiveness in Achieving Outcome
10
C.
Efficiency in Achieving Outcome and Outputs
11
D.
Preliminary Assessment of Sustainability
11
E.
Impact
11
IV.
OVERALL ASSESSMENT AND RECOMMENDATIONS
13
A.
Overall Assessment
13
B.
Lessons
14
C.
Recommendations
14
APPENDIXES
1.
Chronology of Main Events in Program Processing and Implementation
16
2
Update of Policy Matrix
18
3.
Program Framework for Policy Loan
22
4.
Project Framework for Project Loan
27
5.
Cost Breakdown by Project Components
32
6.
Summary of Contracts
33
7.
Annual Average Exchange Rates
37
8.
Project Financing Plan
38
9.
Projected and Actual Disbursements of Loan Proceeds
39
10.
Implementation Schedule
40
11.
Organization Chart Of Madhya Pradesh State Electricity Board
42
12.
Status of Compliance with Major Loan Covenants
43
13.
Financial and Economic Evaluation
47
14.
Quantitative Assessment of Overall Program Performance
57
i
BASIC DATA
A.
Loan Identification
1.
Country
2.
Loan Numbers
3.
Program Title
4.
Borrower
5.
Executing Agencies
a. Program Loan
b. Project Loan
6.
Amount of Loan
India
1868 and 1869
Madhya Pradesh Power Sector Development
Program
India
Department of Finance, Government of
Madhya Pradesh
Madhya Pradesh State Electricity Board
a.
Program Loan
$150 million
b.
Project Loan
Net after cancellation
$178.99 million
First cancellation
$13.575 million (14 April 2005)
Second cancellation
$7.434 million (3 April 2007)
7.
Program Completion Report Number IND 1032
B.
Loan Data
1.
Appraisal
Date Started
Date Completed
2.
Loan Negotiations
Date Started
Date Completed
3.
Date of Board Approval
4.
Date of Loan Agreement
5.
Date of Loan Effectiveness
In Loan Agreement
Actual
Number of Extensions
6.
Closing Date
a.
Program Loan
Actual
b.
Project Loan
In Loan Agreement
Actual
Number of Extensions
27 August 2001
18 September 2001
7 November 2001
9 November 2001
6 December 2001
21 March 2002
22 March 2002
22 March 2002
None
28 November 2003
30 June 2006
3 April 2007
One
ii
7.
Terms of Loan
Project Loan
Interest Rate
Maturity
Grace Period
London interbank offered rate-
based
20 years
5 years
8.
Terms of Relending (if any)
Project Loan
Interest Rate
12%
Maturity (number of years )
20 years
Grace Period (number of years)
5 years
Second-Step Borrower
Madhya Pradesh State
Electricity Board
9.
Disbursements
a.
Dates
(i) Program
Initial Disbursements
Final Disbursements
Time Interval
25 March 2002
28 November 2003
20 months
Effective Date
Original Closing Date
Time Interval
22 March 2002
28 November 2003
20 months
(ii) Project
Initial Disbursements
Final Disbursements
Time Interval
31 October 2002
3 April 2007
53 months
Effective Date
Original Closing Date
Time Interval
22 March 2002
31 December 2006
57 months
b.
Amount ($ million)
(i) Program Loan
Tranche Number
Date Disbursed
Amount
Disbursed
First Tranche
25 March 2002
65.00
Second Tranche
25 October 2002
40.00
Third Tranche
28 November 2003
43.50
iii
(ii) Project Loan
Category
Original
Allocation
Last
Revised
Allocation
a
Amount
Canceled
Amount
Disbursed
Undisbursed
Balance
01 Equipment
159.10
181.80
22.70
174.37
7.44
02 Consulting
1.80
0.00
(1.80)
0.00
0.00
03 Front End Fee
2.00
2.00
0.00
2.00
0.00
04 Interest During
Construction
16.20
2.63
(13.58)
2.63
0.00
05 Unallocated
20.90
0.00
(20.90)
0.00
0.00
Total
200.00
184.63
(13.58)
178.99
7.44
a.
The revised allocation was effective on 23 December 2005.
Source: Asian Developm ent Bank records.
C.
Program and Project Data
1.
Program and Project Cost ($ million)
Cost
Appraisal Estimate
Actual
(i) Program Loan
Foreign Exchange Cost
150.00
150.00
Total
150.00
150.00
(ii) Project Loan
Foreign Exchange Cost
200.00
178.99
Local Currency Cost
118.90
81.06
Total
318.90
260.05
2.
Project Financing Plan ($ million)
Appraisal Estimate
Actual
Source
Foreign
Local
Total
Foreign
Local
Total
ADB
200.00
0.00
200.00
178.99
0.00
178.99
MPSEB
0.00
118.90
118.90
0.00
81.06
81.06
Total
200.00
118.90
318.90
178.99
81.06
260.05
ADB = Asian Development Bank, MPSEB = Madhya Pradesh State Electricity Board.
Source: MPSEB.
iv
3.
Cost Breakdown by Project Component ($ million)
Appraisal Estimate
Revised Estimate
a
Actual
Foreign
Local
Total
Foreign
Local
Total
Foreign Local
Total
A. Project Components
1.
33 kV and 11 kV
Systems
Improvement
55.80
27.10
82.90
52.50
28.50
81.00
55.20
12.30
67.50
2.
11 kV Conversion
5.30
1.80
7.10
3.90
1.80
5.70
4.10
1.00
5.10
3.
Transmission
System
Reinforcement
89.10
29.60 118.70
99.50 54.000
153.50 114.45
18.66
133.11
4.
Computerized
Information and
Revenue
Management System
7.80
2.00
0.00
7.80
2.00
9.80
0.00
0.00
0.00
5.
Metering
1.10
0.00
0.00
0.70
0.00
0.70
0.61
0.00
0.