Building Standards 1 of 32 17w.doc Revised: pending 2003 17.000
Building Standards
1 of 32
17w.doc
Revised: pending 2003
17.000
QUEMS II .................................................................................................... 2
17.001
Responsibility For Supply ......................................................................... 2
17.002
Field Control Work .................................................................................... 3
17.003
Building Automation System ..................................................................... 3
17.004
Removal of Existing Devices .................................................................... 3
17.101
DDC Control Panel ................................................................................... 3
17.102
Expanders, Multiplexors etc...................................................................... 4
17.103
Power Supply............................................................................................ 4
17.104
Remote Computer Connection ................................................................. 4
17.105
DDC Graphics........................................................................................... 4
17.106
Spare Parts............................................................................................... 5
17.107
DDC Software........................................................................................... 5
17.200
Sensors.................................................................................................... 5
17.201
Duct Temperature Sensors....................................................................... 5
17.202
Room Temperature Sensors..................................................................... 6
17.203
Duct Temperature Averaging Sensors...................................................... 6
17.204
Outdoor Air Temperature Sensors............................................................ 6
17.205
Duct Humidity Sensors ............................................................................. 6
17.206
Room Humidity Sensors ........................................................................... 6
17.207
Duct Air Flow Sensors .............................................................................. 7
17.208
Immersion Sensors................................................................................... 7
17.209
Status Relays............................................................................................ 7
17.210
Freezestats ............................................................................................... 7
17.211
Pressure Sensors ..................................................................................... 7
17.212
Current Operated Switches....................................................................... 8
17.300
Actuators (Output Transducers) ........................................................... 8
17.301
Solid State Relays .................................................................................... 8
17.302
Electric to Pneumatic Transducers ........................................................... 8
17.400
Cabling..................................................................................................... 9
17.401
Cabling to Field Interface Box (FIB).......................................................... 9
17.402
Floor Distribution....................................................................................... 9
17.403
Cable Termination .................................................................................... 9
17.404
Room Temperature Sensor Cable ............................................................ 9
17.405
Remote I/O Unit Network Cable................................................................ 9
17.500
Installation Practices .............................................................................. 9
17.501
Installation Practices - General ................................................................. 9
17.502
Conduits.................................................................................................... 9
17.503
Cable Splice and Termination................................................................. 10
17.504
Cable Labelling ....................................................................................... 11
17.505
Pneumatic Installation............................................................................. 11
17.506
Component Labelling .............................................................................. 12
17.507
Component Attachment .......................................................................... 12
17.508
Outdoor Air Temperature Sensors.......................................................... 12
17.509
Control Panel Installation ........................................................................ 13
Building Standards
2 of 32
17w.doc
Revised: pending 2003
17.510
Field Interface Devices ........................................................................... 13
17.511
Thermowell Installations ......................................................................... 14
17.512
Communication Installations ................................................................... 14
17.513
Cutting, Patching and Painting................................................................ 14
17.514
Cleaning.................................................................................................. 14
17.515
Fire Prevention ....................................................................................... 14
17.516
Existing Enclosures ................................................................................ 14
17.517
Sensor Installation .................................................................................. 15
17.518
Dampers and Valves............................................................................... 15
17.600
Programming ....................................................................................... 15
17.601
Naming Convention ................................................................................ 15
17.602
Programs ................................................................................................ 15
17.700
Commissioning..................................................................................... 16
17.701
Procedure ............................................................................................... 16
17.800
Documentation...................................................................................... 16
17.801
Requirements ......................................................................................... 16
17.802
Standards and Format ............................................................................ 17
17.803
Schedule for Provision of Documentation ............................................... 17
APPENDIX A
Descriptor Naming Guideline (17.601).......................................... 18
APPENDIX B
Operations Manual Sample Building (17.802)......................... 25
Appendix B-1
Overview of Heating, Ventilation and Air Conditioning Systems
(HVAC) 25
Appendix B-2
Panel 49, Points List ........................................................................ 26
Appendix B-3
Elements List Legend ...................................................................... 27
Appendix B-4
Schedules Winter/Summer ............................................................. 28
Appendix B-5
Schematics Air Handling System: A03 (Drawing No. C100)....... 29
Appendix B-6
Floor Plans Ground Floor Plan (Drawing No. 30-A001).............. 30
Appendix B-7
Riser Diagram Sample Building Riser Diagram (Drawing No.
E000) 31
Appendix B-8
FIB Electrical Panel Layout (Drawing No. C000) ...................... 32
Appendix B-9
BIS Pneumatic Panel Layout (Drawing No. C000).................... 32
17.000 QUEMS
II
17.001
Responsibility For Supply
.1
All DDC control panels, expanders and multiplexors, etc. shall be supplied by the
contractor. The panel cabinets and all necessary installation components shall be
supplied by the contractor.
Suppliers
.2
The successful supplier shall be responsible for all work under this contract.
Building Standards
3 of 32
17w.doc
Revised: pending 2003
17.002
Field Control Work
.1
Work shall include all the required services to complete the system.
.2
Work shall include the supply and installation of all field devices including sensors,
interface devices, individual room controls, transducers, relays, valves, dampers,
actuators, solenoid valves, field wire, tubing, BIX terminations, connections and
panel.
.3
The contractor shall provide all necessary co-ordination in order to achieve a
successful project.
17.003
Building Automation System
.1
Work shall include installation of