AVAILABILITY
Available for lighting Service sold for outdoor lighting supplied from the existing overhead secondary
Distribution System of the Company and contracted for by a private Customer. The rating of lamps in lumens is for
identification and shall approximate the manufacturer's standard rating.
MONTHLY RATE
Nominal Lamp Size
Distribution
Transmission
Generation
High Pressure Sodium Lamp :
9,500 Lumen
1
- .... 100 Watt....... 51 kWh.....................$8.12.............................* ...................................$1.03
22,000 Lumen
2
- .... 200 Watt....... 86 kWh...................$14.07.............................* ...................................$1.74
Mercury Vapor Lamp:
8,150 Lumen
1
- .... 175 Watt....... 74 kWh.....................$8.16.............................* ...................................$1.50
21,500 Lumen
2
- .... 400 Watt..... 162 kWh...................$15.01.............................* ...................................$3.28
The transmission and generation charges apply only to Customers receiving Default Service from the
Company. These charges do not apply to Customers obtaining Competitive Energy Service from a Competitive
Service Provider.
1
Company will provide lamp, photo-electric relay control equipment, fixture and upsweep arm not over 4 feet in
length, and will mount same on an existing pole carrying secondary circuits.
2
Company will provide lamp, photo-electric relay control equipment, fixture and upsweep arm not over 6 feet in
length, and will mount same on an existing pole carrying secondary circuits.
When facilities, in addition to those specified above are required to provide outdoor lighting Service, the
Customer will pay in advance the cost of installing all additional facilities. For those facilities installed prior to
December 13, 1985, where the Company provided facilities at a monthly rental, such monthly charges will continue at
a rate of $ 2.74 for each standard distribution wood pole required, $0.013 per foot for each foot of span length of
wires required, and $ 2.74 of each kilovolt-ampere of transformer capacity installed.
The Customer may elect to own and maintain poles and secondary circuits on his property to accommodate
the installation of the outdoor lighting fixture. Such poles and circuits shall meet Company specifications.
ISSUED BY BRUCE E. WALENCZYK, VICE PRESIDENT
Issued January 7, 2002
Effective for all bills
rendered on and after
January 8, 2002
Issued under Order of the S.C.C. dated 12/ 21/ 2001 in Case No. PUE000280
THE POTOMAC EDISON COMPANY
Second Revision of
Doing Business As
Original Page No. 13-1
ALLEGHENY POWER
S. C. C. Va. No. 15
Canceling
First Revision of
Original Page No. 13-1
OUTDOOR LIGHTING SERVICE
SCHEDULE "OL" (Continued)
MONTHLY RATE (Continued)
TRANSMISSION
CHARGES:*
Nominal Lamp Size
8,150 Lumen9,500 Lumen 21,500 Lumen
22,000 Lumen
Transmission
Charges
................................................................. $0.05...................... $0.03 .................... $0.10................... $0.05
Ancillary
Services:
Scheduling, System Control & Dispatch ...... $0.00...................... $0.00 .................... $0.00................... $0.00
Energy
Imbalance ...........................................$0.00 .......................$0.00 ......................$0.00 ....................$0.00
Reactive and Voltage Control .........................$0.00 .......................$0.00 ......................$0.01 ....................$0.00
Regulation and Frequency Response ............$0.00 .......................$0.00 ......................$0.01 ....................$0.00
Spinning
Reserve............................................$0.01 .......................$0.00 ......................$0.01 ....................$0.01
Supplemental
Reserve....................................$0.01 .......................$0.00 ......................$0.01 ....................$0.01
The transmission charges are based on PJMs Open Access Transmission Tariff which will change from time
to time and is subject to Federal Energy Regulatory Commission (FERC) approval.
LEVELIZED PURCHASED POWER FACTOR
Applies to all kilowatt-hours served under this Rate Schedule.
CONSUMPTION TAX
Applies to all kilowatt-hours served under this Rate Schedule.
LATE PAYMENT CHARGE
Applies to this Rate Schedule as set forth in Company Rule No. 12 of this tariff.
TERM OF CONTRACT
Service is sold under contract to take continuous Service under this Rate Schedule for a minimum period of
three years or longer for Distribution Charges.
In the event of early termination, the Customer shall pay either the balance of the contract responsibility or
the net cost of installation and removal of the facilities installed by the Company to serve the Customer, whichever is
less.
GENERAL
Service supplied is subject to the Rules and Regulations Covering the Supply of Electric Service of the
Company as filed with the Commission.
All Company owned facilities necessary for Service under this Rate Schedule shall be maintained by the
Company and all such Service and maintenance will be performed only during the regular scheduled working hours
of the Company. The Company shall be allowed two working days after notification by the Customer to replace all
burned-out lamps.
ISSUED BY DAVID E. FLITMAN, PRESIDENT
Issued December 21, 2007
Effective for service
rendered on and after
December 20, 2007
Issued under Order of the S.C.C. dated 12/20/ 2007 in Case No. PUE-2007-00085
THE POTOMAC EDISON COMPANY
Original Page No. 13-2
Doing Business As
S. C. C. Va. No. 15
ALLEGHENY POWER
OUTDOOR LIGHTING SERVICE
SCHEDULE "OL" (Concluded)
All lamps are lighted from dusk to dawn every night, or for approximately 4,200 hours per annum.
The Customer shall obtain written approval from public authorities for lights to be located on public
thoroughfares.
The Customer shall select the location of all poles installed on the Customer's property under the provisions
of this Rate Schedule and poles will be moved after installation, on payment by the Customer of the cost of moving.
All pole locations shall conform to all safety standards, state and municipal regulations. The Customer shall be
responsible for all damages to, or loss of, the Company's property located on the Customer's premises unless
resulting from causes beyond the Customer's control.
ISSUED BY BRUCE E. WALENCZYK, VICE PRESIDENT
Issued January 7, 2002
Effective for all bills
rendered on and after
January 8, 2002