TRANSFORMER PAD LOCATION AND SPECIFICATION

page taken as our search engine crawled the Web.
The web site itself may have changed. You can check the current page or check for previous versions at the Internet Archive. Yahoo! is not affiliated with the authors of this page or responsible for its content.
TRANSFORMER PAD LOCATION AND SPECIFICATION
TRANSFORMER PAD LOCATION AND SPECIFICATION
CUSTOMER AGREES TO:
Provide recorded easement for all FPL facilities on Customer's property. FPL will not start construction until these
easements are cleared by the customer of all conflicts preventing construction. Should paving, grass, landscaping
or sprinkler systems be installed prior to construction of the underground distribution facilities, the customer will
bear the cost of restoring same to their original condition.
Provide location and depth information for all underground facilities and fill or cut to within 6 inches of final grade
within the easement. (See attached referenced prints.)
Notify FPL representative two weeks in advance of paving schedule so that FPL can install ducts if required.
Make arrangements for location of FPL pads as shown on location sketch. Provide and install secondary service to
padmount transformer. Use a maximum of 8 cables per leg. (See pad detail for entrance space availability for
customer service cable) Terminate conduits 3 inches above final grade and provide 7 feet
of cable per leg beyond the conduit ends for connection to transformer terminals.
Compact and level 3 inches below final grade an area sufficient for the concrete pad. Provide clear space of 8 feet at
the front and 4 feet at sides and rear of the transformer pad to allow for a safe working area.
Keep area above transformer pad clear to allow setting transformer with a crane. If current transformers are
required, provide and install 1 1/4 inch rigid conduit from CT's to meter location. Maximum horizontal distance from
pad to meter varies with the size of CTs, please seek assistance from your FPL service planner.
Provide a clear space 36 inches in front of meters. If built up meter centers are to be used, provide FPL
representative with shop drawings of centers and layout sketch of meter room for FPL approval prior to purchase
FPL AGREES TO:
Provide and install pad and padmount transformer.
Provide and install primary ducts and/or cable from FPL facilities to the padmounted transformer.
Provide and install ground rods at the transformer.
Connect customer's service cables to FPL facilities in transformer compartment.
Provide meter wiring when current transformers are required.
Provide and install protector posts if required.
Provide ____ volt ____Phase service.