System 1

tr>
System 1





DRAWINGS



1: PANEL & CLIP PROFILE
2: LOCKING EAVE FLASHING
3: LOCKING EAVE FLASHING
4: HI EAVE FLASHING
5: RAKE GABLE FLASHING
6: RIDGE HIP COVER
7: VENTED RIDGE
8: FLOATING VALLEY
9: PITCHBREAK FLASHING
10: ROOF TO WALL FLASHING
System 1 DRAWING
NO.

1

12 TO 20
3/4MAX
FIELD NOTCH 1 AND HEM
UNDER DRIP.
WITH STRIATIONS
WITH STRESS RIBS
DATE: 8-28-00
SUBJECT: CLIP AND PANEL PROFILE
BEND CLIP FLANGES
OVER PANELS
SNAP ON COVER
HOLD DOWN CLIP
HOLD DOWN CLIP
REV: 2-1-06
System 1 2 BEADS OF CONTINOUS SEALANT ON DRIP
# 10-13 X 1
FASTEN 12 O,C.
FIELD NOTCH 1
MIN. AND HEM
UNDER
EAVE FLASHING. SEE
DETAIL BELOW FOR
CAULKING PATTERN
# 12-14 X 3/4 FASTENER
HANGERS 30 O.C.
DATE: 8-28-00
DRAWING
NO.

2

SUBJECT: LOCKING EAVE FLASHING
REV: 2-1-06
System 1 2 BEADS OF CONTINOUS SEALANT ON DRIP
# 10-13 X 1
FASTEN 12 O.C.
FIELD NOTCH 1
MIN. AND HEM
UNDER
EAVE FLASHING. SEE
DETAIL BELOW FOR
CAULKING PATTERN
CLEAT IF EAVE FLASHING
FACE IS MORE THAN 3 OR
EXTREME CONDITIONS.
DATE: 8-28-00
REV:
DRAWING
NO.

3

SUBJECT: LOCKING EAVE FLASHING
2-1-06
System 1 # 10-13 X 1
2 FASTENERS PER 12 PANEL.
3 FASTENERS FOR WIDER PANELS

# 10-13 X 1 AT
12 O.C.
CLEAT. SEE NOTE
ON DWG 5
HIGH EAVE FLASHING
ZEE CLOSURE
3/32 X 1 BUTYL TAPE
POP RIVETS 12 O.C.
CAULK VERTICAL EDGE OF ZEES
DATE: 8-28-00
REV:
DRAWING
NO.

4

SUBJECT: HI-EAVE FLASHING
2-1-06
System 1 FIELD BEND PANEL UP
1 MIN.
3/32 X 1 BUTYL TAPE
CLIPS AT 18 O.C. MAX.
WITH 1 # 10-13 X 1 FASTENER EACH.
FASTENER SHOULD PENETRATE DECK.
RAKE FLASHING
CLEAT IF RAKE
FLASHING FACE IS
WIDER THAN 3 OR
FOR EXTREME
CONDITIONS.
1/8 POP RIVET 12 O.C.
# 10-13 X 1 AT 12 O.C.
# 10-13 X 1 AT
12 O.C.
DATE: 8-28-00
REV:
DRAWING
NO.

5

SUBJECT: RAKE- GABLE FLASHING
2-1-06
System 1 # 10-13 X 1
2 FASTENERS PER 12 PANEL.
3 FASTENERS FOR WIDER PANELS

3/32 X 1 BUTYL TAPE
ZEE CLOSURE
RIDGE / HIP COVER
POP RIVETS 12 O.C.

CAULK VERTICAL EDGE OF ZEES
DATE: 8-28-00
REV:
DRAWING
NO.

6

SUBJECT: RIDGE - HIP COVER
2-1-06
System 1 # 10-13 X 1
2 FASTENERS PER 12 PANEL.
3 FASTENERS FOR WIDER PANELS
3/32 X 1 BUTYL TAPE
8
VENTED
ZEE CLOSURE
VENTED RIDGE
POP RIVETS 12 O.C.
CAULK 10
CAULK VERTICAL EDGE OF ZEES
DATE: 1-12-01
DRAWING
NO.

7

SUBJECT: VENTED RIDGE CAP
REV: 2-1-06
System 1 # 10-13 X 1
FASTEN 12 O.C.
LINE OF SUBSTRATE
3/32 X 1 BUTYL TAPE
VALLEY FLASHING
JOGGLE CLEAT
FIELD NOTCH & HEM PANEL 1 MIN.

4 MIN.
DATE: 8-28-00
REV:
DRAWING
NO.

8

SUBJECT: FLOATING VALLEY
2-1-06
System 1 # 10-13 X 1
2 FASTENERS PER 12 PANEL.
3 FASTENERS FOR WIDER PANELS
ZEE CLOSURE
3/32 X 1 BUTYL TAPE
PITCHBREAK FLASHING
POP RIVETS 12 O.C.
CAULK VERTICAL EDGE OF ZEES
1/8 POP RIVETS
12 O.C.
CAULK
DATE: 8-28-00
REV:
DRAWING
NO.

9

SUBJECT: PITCHBREAK FLASHING
2-1-06
System 1 FIELD BEND PANEL UP
1 1/2 MIN.
1/8 POP RIVET 12 O.C.
3/32 X 1 BUTYL TAPE
ROOF TO WALL FLASHING
COUNTER FLASHING
FASTEN
12 O.C.
# 10-13 X 1 AT 12 O.C.
DATE: 8-28-00
REV:
DRAWING
NO.

10

SUBJECT: ROOF TO WALL FLASHING
2-1-06
System 1