Install.Instruc.Insert 1-08
1 color=blue>
« back to results for ""
Below is a cache of http://www.homasote.com/Installation/440SBCombined.pdf. It's a snapshot of the page taken as our search engine crawled the Web.
The web site itself may have changed. You can check the current page or check for previous versions at the Internet Archive.
Yahoo! is not affiliated with the authors of this page or responsible for its content.
Install.Instruc.Insert 1-08
Installation Instructions
homasote
COMPANY, 932 Lower Ferry Road, West Trenton, New Jersey 08628, Phone: (800) 257-9491
www.homasote.com, For Technical Support call Ext. 1332 or e-mail techhelp@homasote.com
Table of Contents
F
FLOORING APPLICATION
PAGE
Packaging / Storage / Application As A Flooring Underlayment and as a Wall Panel
2
F-A) Installation of Carpet & Pad over Homasote Method 1 (Wood Sub-floor)
2
Recommended Glue-Nail/Screw Pattern Over Wood Sub-floor
2
F-B) Installation of Carpet & Pad over Homasote Method 2 (Wood Sub-floor)
3
F-C) Installation of Vinyl / Linoleum / Wood Parquet / Glue-Down Carpet over Homasote (Wood Sub-floor)
3
F-D) Installation of Tile Flooring over Homasote Tile Not Directly Adhered (Wood Sub-floor)
3
F-E) Installation of Tile Flooring over Homasote Tile Directly Adhered to Homasote (Wood Sub-floor)
3
F-F) Installation of Floating Finished Floors over Homasote (Wood Sub-floor)
3
F-G) Installation of Hardwood Flooring Applications over Homasote (Wood Sub-floor)
3
F-H) Installation Hardwood Flooring Applications over Homasote (Concrete Sub-floors)
4
F-I) Installation of Carpet & Pad over Homasote (Concrete Sub-floors)
4
F-J) Installation of Laminate or Floating Floor over Homasote (Concrete Sub-floor)
4
W
WALL APPLICATION - INTERIOR VERTICAL
W1-A) 440 SoundBarrier
®
to Wood or Metal Framing
5
W1-B) Decoupled Wall System Enhanced Sound Attenuation
5
W1-C) Double Wall Construction STC 66
5
W1-D) 440 SoundBarrier to Masonry Wall
5
W2-A) Fabric-Wrapped 440 SoundBarrier To Wood or Metal Framing
6
W2-B) Fabric-Wrapped 440 SoundBarrier To Masonry Walls
6
W2-C) Fabric-Wrapped 440 SoundBarrier To Finished Walls
6
W2-D) Complete Instructions for Metal Frame Clips
6
C
CEILING APPLICATION
Ceiling Construction
6
Homasote Installed to Ceiling Joist
6
Reisilient Channels Installed to Ceiling Joists
6
R
EXTERIOR VERTICAL SHEATHING APPLICATION
To Wood or Metal Framing Applied to Corners
7
To Wood or Metal Framing Applied to Field
7
440 SoundBarrier Specifications
8
a n d N . C . F. R .
®
H o m a s o t e
®
HOW TO DEADEN SOUND THROUGH
Floors Walls Ceilings
Easy Cut and Glue
Maintain 3/16 Spacing Between Panels
Read All Instructions Carefully
Nail and Finish Floors and Walls
Packaging, Storage and Protection
All Homasote products having a maximum 4 width are packaged in plastic covered units. However, when
stored outside, all materials should be stored above grade on wooden pallets and covered by waterproof
tarpaulins. Packaging material is not intended for exterior job site protection.
Interior Applications
General Requirements:
Temperature and humidity conditions closely approximating those which will exist when
building is occupied shall be maintained before, during, and after the application of panels. Installation shall not be
made when building is excessively dry, cold, hot or damp.
All panels shall be removed from plastic covered units
and separated not less than 24 hours prior to installation to allow material to acclimate.
Applications as a Floor Underlayment
During installation, leave a 3/16" space between each panel. All panels must be spaced 3/8" from all walls and
partitions at all times. This will allow for the natural expansion and contraction of the Homasote panels. On runs
over 50, provide 1/2" expansion joint. All panel joints must be staggered regardless of panel size. When installing,
hold annular threaded nails or screws back a minimum of 3/4" from all panel edges.
Applications as a Wall Panel
Homasote panels should be applied vertically to the framing with blocking or plates at top and bottom of panel.
All edges of panel must fall on framing at all times. If an edge does not fall on any framing, then blocking
must be installed. Framing for 1/2" thick panels must not exceed 16" o.c. Framing for 5/8" and 3/4" thick
panels must not exceed 24" o.c. During installation, all panels must be installed vertically leaving 1/8"
expansion gap between sheets and 1/4" expansion gap at floor, ceiling, and around window and door frames,
etc. Do not fill or tape panel joints. Vertical installation only. If left exposed 440 SoundBarrier may be painted
with a quality latex based primer and finish paint applied by brush and/or roller. DO NOT SPRAY PANELS.
4) Follow immediately with nailing or screwing of Homasote panel to
wood sub-floor; from the center out, using annular threaded nails or
screws of sufficient length to penetrate a minimum of 1/2" into wood
sub-floor. Nail or screw as shown in the "Glue-Nail/Screw Pattern Over
Wood Sub-floor" below. Nail or screw Homasote panel additionally in
any areas that are not lying down flat into adhesive.
Note: If adhesive is omitted, panels must be nailed or screwed 6" o.c.
along panel edges and 10" o.c. throughout the field of the board.
5) Follow with next panel, leaving 3/16" expansion space between panels
and 3/8" off walls and partitions at all times.
6) After a minimum of 48 hours for adhesive to set, nail tackless strips to
the top of wood nailers, followed by the installation of carpet and pad.
Over Wood Sub-Floor
Wood sub-floor must be flat (not cupped), dry lumber, level and
securely fastened to joists. Shim or sand sub-floor as necessary
to provide flat surface continuity for Homasote panels.
Note: Performance Specifications AFG-01 (developed by APA
The Engineered Wood Association) requires that glues applied
at the job site be sunlight resistant, strong under many
moisture and temperature conditions, and able to fill gaps.
F-A. Homasote installations for use with
Carpet and Pad Method 1
Homasote AND Tack strip installed directly to wood sub-floor.
1) 1/2" thick by 1-1/2" wide wood nailers shall first be nailed and/or glued
to wood sub-floor at all locations where tackless strips are to be used.
Note: 1/2" tack-strip shims are available and may replace wood nailers
around perimeter of room for attachment of carpet and pad. Contact
your local flooring dealer for more details.
2) Apply a 3/8" bead of APA-approved sub-floor adhesive meeting APA
AFG-01 specification to Homasote panel, holding back 3/4" from panel
edge, as shown in the "Glue-Nail/Screw Pattern Over Wood Sub-floor"
below.
3) Turn Homasote panel over and place adhesive side down to wood
sub-floor.
Over Wood Sub-Floor
F
FLOORING APPLICATION
FOR ALL INSTALLATIONS
Glue-Nail/Screw Pattern over Wood Sub-floor
440 SoundBarrier
®
and N.C.F.R.
®
Homasote
®
Combined Installation Instructions
2
440 SoundBarrier
F-B. Homasote installations for use with
Carpet and Pad Method 2
Homasote installed to wood sub-floor.
Tack strip applied directly to Homasote.
1) Follow 2,3,4,5 of "A. Homasote installations for use with Carpet and Pad
Method 1."
2) After a minimum of 48 hours for adhesive to set, install tack strips
directly to Homasote panel using annular threaded nails or screws
sufficient in length to penetrate through the Homasote and 1/2" into
wood sub-floor.
3) Install carpet as per carpet manufacturers installation instructions.
Note: Contact your local flooring retailer for more information on
"tack-strip nail extensions" for application of tack strips.
F-C. Homasote installations for use with glue-
down applications such as: Vinyl, Linoleum,
Glue-down Wood Strip Flooring, Wood Parquet,
and Glue-down Carpet
Homasote installed to wood sub-floor
1) Follow 2,3,4,5 of "A. Homasote installations for use with Carpet and Pad
Method 1."
2) After a minimum of 48 hours, apply 1/4" or greater thickness
APA-approved plywood of suitable underlayment grade over
Homasote panel, staggering the joints.
3) Attach the 1/4 plywood over Homasote panel, assuring that plywood
joints do not coincide with the Homasote joints. Follow the plywood
manufacturers recommended method and pattern of attachment, mak-
ing sure that mechanical fasteners are of sufficient length to penetrate
through Homasote panel and into wood sub-floor a minimum of 1/2".
4) After a minimum of 48 hours, install finish floor covering in strict
accordance with manufacturers instructions.
NOTE: Do not adhere finished floor directly to the Homasote panels.
F-D. Homasote installations for use with Tile
Flooring
Homasote installed to wood sub-floor.
Tile NOT directly adhered to the Homasote panels.
1) Follow 2,3,4,5 of "A. Homasote installations for use with Carpet and Pad
Method 1," but
screw and glue with one screw per square foot. Do not
nail. Use 4 x 4 panels only. Allow 24 hours for sub-floor adhesive to set.
2) After a minimum of 24 hours, install cementitious backer board (or
plywood or approved substrate) over Homasote panels. Install cement
board in strict accordance of manufacturers installation instructions. If
plywood is used as underlayment, refer to "F-C Homasote installations
for use with glue-down applications" for applying plywood over
Homasote panels.
3) Cementito