dot.ca.gov/hq/esc/osfp/project-development/...
ace=arial size=-1 color=black>
Below is a cache of http://www.dot.ca.gov/hq/esc/osfp/project-development/information-and-procedures-guide/editable-attachments/4-01-attachment-3.doc. It's a snapshot of the page taken as our search engine crawled the Web.
The web site itself may have changed. You can check the current page or check for previous versions at the Internet Archive.
Yahoo! is not affiliated with the authors of this page or responsible for its content.
Project
Description:
Dist:
County:
Route:
PM:
EA:
Date:
Bridge
Name and Number:
STUDY, CHECK, GET, CIRCLE, FILL-IN OR CROSS
OUT APPROPRIATE ITEMS
1. FIELD INVESTIGATION OBJECTIVE
Obtain all data necessary for the de</span><span class="Message-0020Header-0020First--Char" style=" font-size: 12pt;
">signer and specification writer to prepare a complete structural design
package. If the information is not obtainable in the field or
in the office, make appropriate notes which indicate who should get
or provide the required information.
2. SITE PLAN
c</span><span class="Message-0020Header--Char" style=" font-size: 12pt;
text-transform: none;">ontrols design or construction is to be located
accurately both horizontally and vertically. Ground and topography to
be removed or buried may be of lesser accuracy, but should show the
conditions at the site as they exist.
Field work: Control lines ______, two benchmarks ____, profiles, ____ contours
by x-section, ____, topography, _____, utilities, ______obstructions,
_____drains, _____, etc.
Verify District or consultant Site Plan, if
available and supplement with such details and with such accuracy to
c</span><span class="Message-0020Header--Char" style=" font-size: 12pt;
text-transform: none;">over a minimum area of 75 feet on either side
of the proposed structure.
Topography: Type of road surface ____, Curbs
_____, walls _____, buildings ____, cellars _____, sidewalks _____,
utilities _____, obstructions ____, etc.
Locate: Railroad R/W ___, sw</span><span class="Message-0020Header--Char" style=" font-size: 12pt;
text-transform: none;">itches _____, signs ___, signals ______, wires
___, utilities ____, rail details _____, etc. within 200 feet of bridge
and roadway centerline.
General: Name of railroad _______________________________
Main line ____, Branch ____, Spur _____.
Between city or town of_________ and _____________________.
Actual railroad standard _____, or M.P. tied to site _________________.
Site of railroad yard ______,or within _____ mile (s) of a switch
(maximum 1 mile).
Horizontal and vertical clearance of existing adjacent structures.
LINE
Stationing, bearing, curves, coordinates, line
intersections, and ties for the following:
Railroad (500 feet each side of the structure center line): Existing
_____ , Proposed _____
Highway or roadway _________________________________________
Ramps _____________________________________________________.
Surveys ___________________________________________________ .
GRADE
Grades, P.I. elevation, vertical curve data,
location of profile and datum for the following:
Railroad (500 feet each side of the structure center line): Existing
_____ , Proposed _____
Highway or roadway _________________________________________
Ramps _____________________________________________________.
TYPICAL
SECTION
Existing ____, Proposed ___, Future wide</span><span
class="Message-0020Header--Char" style=" font-size: 12pt; text-transform: none;
">ning ___ , clearance for the following:
Railroad ___________________________________________________.
Highway or roadway _________________________________________
Ramps _____________________________________________________.
Sidewalk ___________________________________________________
SUPERELEVATION
AND TRANSITION
Structure ____, railroad ______, highway ______,
ramps _____
TRAFFIC
Railroad: Type _________