DESIGN DELIVERABLES CONTENT AND FORMAT REQUIREMENTS

.................................. 2 
P
ROJECT
P
ROGRAM

............................................................................................................................... 2 
C
ONTEXTUAL
A
NALYSIS
(C
OMPLETION
)

W
HEN
R
EQUIRED

...................................................................... 3 
C
LASS
C

C
ONSTRUCTION
C
OST
E
STIMATE
.............................................................................................. 3 
C
OST
C
OMPARABILITY
D
ATA
................................................................................................................... 3 
S
COPE AND
C
OST
V
ALIDATION
D
OCUMENTATION
..................................................................................... 3 
100%

D
RAFT
P
REDESIGN
D
OCUMENTS
S
UBMITTAL
F
ORMATS
.................................................................. 3 
F
INAL
P
REDESIGN
D
OCUMENTS
S
UBMITTAL
F
ORMATS
.............................................................................. 3 
SCHEMATIC DESIGN DOCUMENTS (DESIGN-BID-BUILD AND DESIGN-BUILD) ................... 4
 
D
ESIGN
C
ONCEPTS
A
SSESSMENT
........................................................................................................... 4 
S
CHEMATIC
D
ESIGN
A
LTERNATIVES
........................................................................................................ 4 
C
LASS
C

C
ONSTRUCTION
C
OST
E
STIMATES FOR
E
ACH
S
CHEMATIC
D
ESIGN
A
LTERNATIVE
......................... 5 
V
ALUE
A
NALYSIS
R
EPORT
...................................................................................................................... 5 
F
ULLY
D
EVELOPED
S
CHEMATIC
D
ESIGN
P
REFERRED
A
LTERNATIVE
.......................................................... 5 
C
OST
C
OMPARABILITY
A
NALYSIS
............................................................................................................ 7 
100%

D
RAFT
S
CHEMATIC
D
ESIGN
D
OCUMENTS
S
UBMITTAL
F
ORMATS
...................................................... 7 
F
INAL
S
CHEMATIC
D
ESIGN
D
OCUMENTS
S
UBMITTAL
F
ORMATS
................................................................. 8 
DESIGN DEVELOPMENT DOCUMENTS (DESIGN-BID-BUILD AND DESIGN-BUILD) ............. 9
 
D
ESIGN
D
EVELOPMENT
D
RAWINGS
(D
ESIGN
-B
ID
-B
UILD AND
D
ESIGN
-B
UILD
) ............................................. 9 
D
IVISION
1

S
PECIFICATIONS
(D
ESIGN
-B
ID
-B
UILD ONLY
) .......................................................................... 15 
D
IVISIONS
2
THROUGH
16

O
UTLINE
S
PECIFICATIONS
(D
ESIGN
-B
ID
-B
UILD AND
D
ESIGN
-B
UILD
) .................. 15 
I
NITIATE
C
ONSTRUCTABILITY
A
NALYSIS
(D
ESIGN
-B
ID
-B
UILD ONLY
) .......................................................... 15 
P
RODUCT
F
ILE
(D
ESIGN
-B
ID
-B
UILD AND
D
ESIGN
-B
UILD
) ........................................................................ 15 
D
RAFT
C
ONTRACT
P
RICE
S
CHEDULE
(D
ESIGN
-B
ID
-B
UILD ONLY
) ............................................................. 15 
U
PDATED
C
LASS
B

C
ONSTRUCTION
C
OST
E
STIMATE
(D
ESIGN
-B
ID
-B
UILD ONLY
) ...................................... 16 
D
RAFT
D
ESIGN
D
EVELOPMENT
D
OCUMENTS
S
UBMITTAL
F
ORMATS
(D
ESIGN
-B
ID
-B
UILD AND

D
ESIGN
-B
UILD
) .................................................................................................................................... 16 
R
ESPONSES TO
D
RAFT
D
ESIGN
D
EVELOPMENT
D
OCUMENTS
S
UBMITTAL
R
EVIEW
C
OMMENTS
(D
ESIGN
-B
ID
-
B
UILD AND
D
ESIGN
-B
UILD
) ....................................................................
E
RROR
!

B
OOKMARK NOT DEFINED
.
 
CONSTRUCTION DOCUMENTS (DESIGN-BID-BUILD AND DESIGN-BUILD) ........................ 17
 
C
ONSTRUCTION
D
RAWINGS
(D
ESIGN
-B
ID
-B
UILD AND
D
ESIGN
-B
UILD
) ...................................................... 17 
D
IVISION
1

S
PECIFICATIONS
(D
ESIGN
-B
ID
-B
UILD ONLY
) .......................................................................... 25 
D
IVISIONS
2
THROUGH
16

C
ONSTRUCTION
S
PECIFICATIONS
(D
ESIGN
-B
ID
-B
UILD AND
D
ESIGN
-B
UILD
) ....... 25 
C
ONTRACT
P
RICE
S
CHEDULE
(D
ESIGN
-B
ID
-B
UILD ONLY
)........................................................................ 25 
P
RODUCT
F
ILE
(D
ESIGN
-B
ID
-B
UILD AND
D
ESIGN
-B
UILD
) ........................................................................ 25 
C
LASS
A

C
ONSTRUCTION
C
OST
E
STIMATE
(D
ESIGN
-B
ID
-B
UILD ONLY
) ..................................................... 25 
M
ATERIAL
S
UBMITTAL
L
IST
(D
ESIGN
-B
ID
-B
UILD ONLY
) ........................................................................... 26 
C
LOSEOUT AND
O
PERATION
&

M
AINTENANCE
(O&M)

R
EQUIREMENTS
(D
ESIGN
-B
ID
-B
UILD ONLY
) ............. 26 
F
INAL
C
ONSTRUCTABILITY
C
HECKLIST
(D
ESIGN
-B
ID
-B
UILD ONLY
) ........................................................... 26 
D
ESIGN
C
ALCULATIONS
(D
ESIGN
-B
ID
-B
UILD AND
D
ESIGN
-B
UILD
) ........................................................... 26 
100%

D
RAFT
C
ONSTRUCTION
D
OCUMENTS
S
UBMITTAL
F
ORMATS
(D
ESIGN
-B
ID
-B
UILD AND

D
ESIGN
-B
UILD
) .................................................................................................................................... 27 
100%

C
OMPLETE
C
ONSTRUCTION
D
OCUMENTS
S
UBMITTAL
F
ORMATS
(D
ESIGN
-B
ID
-B
UILD AND
D
ESIGN
-
B
UILD
) ................................................................................................................................................ 27 
F
INAL
(D
ESIGN
-B
ID
-B
UILD
)
OR
A
PPROVED
(D
ESIGN
-B
UILD
)

C
ONSTRUCTION
D
OCUMENTS

S
UBMITTAL
F
ORMATS
........................................................................................................................... 28 
SUBMITTAL FORMATS (DESIGN-BID-BUILD (DBB) AND DESIGN-BUILD (DB)) .................. 29
 
H
ARD
-C
OPY
D
OCUMENT
S
UBMITTAL
F
ORMAT
........................................................................................ 29 
E
LECTRONIC
D
OCUMENT
S
UBMITTAL
F
ORMAT
....................................................................................... 33 
Page 1 of 36
10/22/2008 Deliverables, Predesign Documents
PREDESIGN DOCUMENTS (DESIGN-BID-BUILD AND DESIGN-BUILD)

100% Draft Predesign Documents shall consist of the following (Additional types of information, processes
and considerations may be required for certain projects.):
Contextual
Analysis (Initiation)

(Not Required for Designated Historic Structures and Historic
Landscapes)

Initiate the
Contextual
Analysis Template
for assessing the existing character of the project site and
buildings by filling in "Description of Existing". See definitions for
Site Character
and
Building
Character
prior to undertaking this effort. The "Contextual Analysis" shall be prepared utilizing the
Contextual
Analysis Template
.
Project Program


The Project Program shall consist of the following, as applicable, for the specific project (additional
considerations may be required for certain projects).

Architectural Program

Functional Requirements
Functional Relationships (Bubble Diagrams and/or Matrices)
Square Foot Area Requirements
Dimensional Requirements and/or Limitations
Unique Design Parameters
Interpretative Program

Site Program

Functional Requirements
Functional Relationships (Bubble Diagrams and/or Matrices)
Square Foot Area Requirements (i.e. parking)
Dimensional Requirements and/or Limitations
Unique Design Parameters
Interpretative Program

Site Analysis

The Site Analysis (narrative/graphic format) shall be prepared based on the following Site
Analysis Checklist:
Topographic Analysis
Slope Analysis
Analysis of Physical Features
Access and Circulation, Traffic and Parking Studies
Vegetation
Existing Water Bodies
Site History
History of Existing Structures and Landscape
On-site Utility Studies
Off-site Utility Studies
Environmental Studies and Reports
Climate Studies
Geotechnical/soils
Hydrologic Studies, Watershed Modeling Studies
Project Requirements
Page 2 of 36
10/22/2008 Deliverables, Predesign Documents
Page 3 of 36
10/22/2008
Existing Conditions Assessment, Hazmat Investigation
Contextual
Analysis (Completion)
When Required


Using the same character analysis process utilized for existing character, complete the
Contextual

Analysis Template
by filling in "Description of Proposed" to document the proposed character of all
new site(s) and building(s) concepts. The completed Contextual Analysis Template will be used by
the NPS to assess contextual compatibility of all forthcoming design concepts.
Class C Construction Cost Estimate

The Class C Construction Cost Estimate shall be prepared in a format matching the
Class C
Construction Cost Estimate
sample.
Cost Comparability Data

The Cost Comparability Data Checklist shall be prepared utilizing the
Cost Comparability Data
Checklist
template /sample.
Scope and Cost Validation Documentation

Document all scope, functionality and cost variations of three similar built non-NPS projects using the
Scope and Cost Validation Report
.
100% Draft Predesign Documents Submittal Formats

Submit 100% Draft Predesign Documents in
Hard Copy Formats
only
.

Project Program
Contextual Analysis (When Required)
Class C Construction Cost Estimate
Cost Comparability Data
Scope and Cost Validation Report
Final Predesign Documents Submittal Formats

Submit Final Predesign Documents in both

Hard Copy Formats

and
Electronic Formats
.

Project