CleanAir Solutions is proud to represent the following Manufacturers:
________________________________________________________________________________
What type of equipment is being used in the room (Define equipment traffic?).
_____________________________________________________________________________________
What number of people are working in the cleanroom at one time?________________________________
How often will people be entering or exiting the cleanroom (frequency per day?).
Seldom (1-3 times per day)
Moderate (4-8 times per day)
Often (9 or more times per day)
What is the occupancy rating of this area? (F1, H6, H3, etc.)
List any flammable or hazardous materials being used or stored in the cleanroom?
_____________________________________________________________________________________
_____________________________________________________________________________________
Do you have a need for explosion proof HEPAs or lights? If so, what Class and Division?
_____________________________________________________________________________________
CLEANROOM DESIGN CRITERIA:
Overall Cleanroom Size: __________ (W) x __________ (L) x __________ (H) (inside dimensions)
Ext./Interior Gown Area: __________ (W) x __________ (L) x __________ (H) (inside dimensions)
Exterior Room Walls:
__________ (W) x __________ (H)
(Type) _____________________
Exterior Curtains:
__________ (W) x __________ (H)
(Type) ______________________
Interior Separating Walls: __________ (W) x __________ (H)
(Type) _____________________
Interior Curtains:
__________ (W) x __________ (H)
(Type) ______________________
Number of Single Doors: ___________
Type: Hinged, latching, locking, or push/pull
Number of Double Doors: ___________
Type: Hinged, latching, locking, or push/pull
Type of Rigidpanel inset: (Sentra Panel)
(Clear Polycarbonate)
(Polypropylene) (Other)
(White
honeycomb)
(Black
honeycomb)
(Foam
Board)
Viewing windows:
(Tempered Glass)
(Clear Polycarbonate)
(UV laminated)
Nominal window size:
________ (W) x ________ (H)
How many Linear Feet? ______________ What is the distance (AFF)?_________________
CleanAir Solutions, Inc.
Needs Analysis Worksheet
CLEANROOM ENVIRONMENT:
Air Classification Requirement (circle):
Gown Room:
Class 100K
Class 10K
Class 1K
Class 100
Class 10/1
Cleanroom:
Class 100K
Class 10K
Class 1K
Class 100
Class 10/1
Type of Air Flow Required (circle):
Direction of Air Flow (circle):
Gown Room: Re-circulating Single
Pass
Gown Room: Vertical Horizontal
Cleanroom: Re-circulating
Single
Pass
Cleanroom: Vertical Horizontal
Lighting Level Requirements:
Typically designed at 100 ft. candles at work
surface.
Special Lighting Requirements (circle):
UV lighting Flow Thru Teardrop Elect.T-8 Ballast
FACILITY INTEGRATION:
HVAC Requirement:
YES NO
Cleanroom Temperature Requirement:
__________°F
(+/-) __________°F
Typical Ambient Temperature Range:
(Min.) __________°F
(Max.) __________°F
Relative Humidity Requirement:
__________%RH
(+/-)
__________%
Typical Ambient Humidity Range:
__________%RH
(+/-)
__________%
Cooling System Requirements (circle):
Air Cooled
Water Cooled
Is chilled water available?
YES
NO
Location of HVAC unit:
Roof
Floor
Other________________
Distance from Cleanroom:______________Linear Feet.
Fire Protection Requirements:
YES NO
Number of Sprinkler Heads Required Per Code:
(Qty)__________
Is there an ACTIVE Sprinkler line available near the cleanroom:
YES
NO
What is the size of the existing ACTIVE city water line?
1
1 ½
2
3
Does the existing active line need to be resized?
YES NO What
size?_______________
CleanAir Solutions, Inc.
Needs Analysis Worksheet
Flooring Requirements:
YES NO
What is the customers existing floor (circle): Concrete
VCT Tile
Rug
Vinyl
What are the necessary flooring preparations: Demolition ____ Floating____ Moisture Test____
(check all that apply)
What type of new flooring (circle):
Epoxy Paint Seamless Vinyl Raised (tile or grated)
Electrical Requirements:
YES NO
Central On/Off control switch panel
YES
NO
Hardwire fan filters and lights
YES
NO
Voltage
of
filters
(circle)
120V 220V 277V DC
Voltage of lights (circle)
115V
277V
Number of 110V duplex outlets
____
Number of 220V outlets
____
Number other outlets (type______ )
____
Molding strip required
YES
NO
If yes, how many feet between outlets
____
List any other special electrical needs:
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
___
Process Piping Requirements:
YES NO
What type of pipe (circle preference): Stainless
Steel
Copper
PVC
Nitrogen Air Requirements:
# of Stubs_______
# of Valves________
CDA Requirements:
# of Stubs_______
# of Valves________
Drain
Requirements:
#
of
Drains_______
Type:_____________
Waste Disposal Requirements:_______________________________________________
Type of Valves or Fittings:
___________________________________________________________
CleanAir Solutions, Inc.
Needs Analysis Worksheet
CERTIFICATION/CLEANING:
Micro-Cleaning Service
YES NO
Floor Scrubbing
YES NO
Floor
Waxing
YES NO
Filter
vacuum
YES NO
Equipment wipe-down
YES NO
Certification Testing:
YES NO
Per Federal Standards 209E
YES NO
Per ISO Standards 14004
YES NO
Pressurization
YES NO
Velocity
YES NO
Particles
YES NO
Leak
Scanning
YES NO
Air
Balancing
YES NO
Fogging
Test
YES NO
Video Documentation
YES NO
ACCESSORIES:
Tables / Work surfaces (state size and circle preference):
Size:______________________ Perforated / Solid
Stainless / Formica
Undershelf
Size:______________________ Perforated / Solid
Stainless / Formica
Undershelf
Size:______________________ Perforated / Solid
Stainless / Formica
Undershelf
Benches (state size and circle preference):
Size:______________________ Tubular / Solid
Stainless / Chrome
Foot Levelers
Size:______________________ Tubular / Solid
Stainless / Chrome
Foot Levelers
Pass-Thrus (state size and circle preference):
Size:______________________ PVC / Formica
Interlock
(manual / auto)
Fire
Rated
Size:______________________ PVC / Formica
Interlock
(manual / auto)
Fire
Rated
CleanAir Solutions, Inc.
Needs Analysis Worksheet
SITE PLANNER:
Job site location:
Floor #________
Bldg. #_________
Building Type:
One Story______
Two Story______
Equipment Available:
Elevator
Scissor Lift
Fork Lift
Ladder _______H.
Is electrical service available at job-site?
YES NO
Volts_____ Phase_____ Amps_____
Building Permits Required?
YES NO
Wet-stamped Drawings & Calculations?
YES NO
Are Existing Building Plans Available?
YES NO
Sketch Cleanroom Layout
North
South
CleanAir Solutions, Inc.
Needs Analysis Worksheet
Other Useful Information:
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________