01. Contract Documentation
Drawings
Are any detail drawings promised for during production?
Is it noted on the Construction drawings so the lead knows to ask
for them?
Are these details included
Exterior Trim
Pilaster detail
Frieze / dentil molding detail
Exterior paneling
Interior Trim
Multiple-piece crown molding?
Mantel work?
Stair trim?
Built-ins
Elevations & materials specified?
HVAC
Are proposed exhaust & return or radiator locations specified?
Are all existing exhaust & return or radiator locations specified?
Are any existing ducts assumed to be in walls to be demolished?
Completion date and schedule
Has the lead reviewed this?
Are the Contract pay dates drawn from this schedule?
Are they listed on the schedule?
Are all onsite Architect meetings listed?
Have all subs been notified of our current projected start time?
Products and Finishes List
What has been identified on the Internet and thus has not been seen
first-hand?
Has a related Buyer Beware clause covering uncertain, untested suppliers
been relayed to the clients?
Allowances
Do allowances represent an acceptable % of the construction budget
(i.e. less than 1%)?
Are allowances provided because of a bona fide need or because of
sloppiness?
Have any subcontractors noted any sight unseen allowances for anything
that should be pinned down sooner rather than later?
Are all allowances clearly listed, and is it clear how cost adjustment
will be made once allowances are firmed up?
Have we included an appropriate corrective framing allowance?
02. Project Management and Setup
Permit Applications
Does permit need to be signed by homeowner?
Are energy calculations required?
Is a demolition debris form filled out?