COVER PAGE FOR THE PEPCO MARYLAND ELECTRIC TARIFF


CURRENT UPDATE

Internet updated on: September 2, 2008
Tariff changes effective: Usage on and after September 1, 2008

Total Pages (+ Cover): 92; Total Schedules: 51 (Includes cover page and table of
contents).

Reason for the Tariff Changes: To update Rider SOS for Type II Rates

Case / Order Reference(s): Case Nos. 9056 and 9064 Order Nos. 81019 and 81449 in
Case No. 9056 effective September 1, 2008. Approved at August 27, 2008 Admin
meeting. Letter order issued August 27, 2008.

Tariff pages changed in this update: Page Nos. 1, 2, 2.1, 2.2, 43, 43.1, 43.2, 43.3, 43.4
43.5, 43.6

Processed By: Patti Johnson



LAST UPDATE
Internet update on or before: July 1, 2008
Tariff changes effective: Usage on and after July 1, 2008

Total Pages (+ Cover): 92; Total Schedules: 51 (Includes cover page and table of
contents).

Reason for the Tariff Changes: To update Rider SOS for transmission rates

Case / Order Reference(s): approved at June 25, 2009 Admin meeting. Letter order issued
June 25, 2008. Effective with usage on and after July 1, 2008.

Tariff pages changed in this update: Page Nos. 1, 2, 2.1, 2.2, 43, 43.1, 43.2, 43.3, 43.4
43.5, 43.6
Processed By: Patti Johnson

Electric--P.S.C. Md. No. 1
MD
Fifty-First Revised Page No. 1

Date of Issue: July 9, 2008
Date Effective: Usage on and after

September
1,
2008




RATE
SCHEDULES


FOR


ELECTRIC SERVICE


IN


MARYLAND



POTOMAC ELECTRIC POWER COMPANY












RATES AND REGULATORY PRACTICES GROUP
Electric--P.S.C. Md. No. 1
MD
Fifty-First Revised Page No. 2

Date of Issue: July 9, 2008
Date Effective: Usage on and after

September
1,
2008


TABLE OF CONTENTS
RATE SCHEDULES

RESIDENTIAL SERVICE - SCHEDULE "R"......................................................................
Page 3 - 3.1

TIME METERED RESIDENTIAL SERVICE - SCHEDULE "R-TM"...................................
Page 4 - 4.1


GENERAL SERVICE - SCHEDULE "GS" .........................................................................
Page 5 - 5.1


TEMPORARY SERVICE - SCHEDULE "T".......................................................................
Page 6 - 6.1


TIME METERED MEDIUM GENERAL SERVICE - LOW VOLTAGE - TYPE II
SCHEDULE "MGT LV II" .............................................................................................
Page 7 - 7.2


TIME METERED MEDIUM GENERAL SERVICE - LOW VOLTAGE - TYPE II A
SCHEDULE "MGT LV II A" (THIS SCHEDULE HAS BEEN DELETED) ..........................
Page
7.3 7.5

TIME METERED MEDIUM GENERAL SERVICE - LOW VOLTAGE - TYPE III
SCHEDULE "MGT LV III" ............................................................................................
Page
7.6 7.8

TIME METERED MEDIUM GENERAL SERVICE - PRIMARY SERVICE - TYPE II
SCHEDULE "MGT 3A II " ............................................................................................
Page 8 - 8.2


TIME METERED MEDIUM GENERAL SERVICE - PRIMARY SERVICE - TYPE II A
SCHEDULE "MGT 3A II A" (THIS SCHEDULE HAS BEEN DELETED) ...................
Page
8.2 8.5

TIME METERED MEDIUM GENERAL SERVICE - PRIMARY SERVICE - TYPE III
SCHEDULE "MGT 3A III" ............................................................................................
Page
8.6 8.8

TIME METERED GENERAL SERVICE - LOW VOLTAGE -
SCHEDULE "GT LV" ...................................................................................................
Page 9 - 9.2


TIME METERED GENERAL SERVICE - PRIMARY SERVICE -
SCHEDULE "GT 3A" ...................................................................................................
Page 10 - 10.2


TIME METERED GENERAL SERVICE - HIGH VOLTAGE -
SCHEDULE "GT 3B" ...................................................................................................
Page 11 - 11.2


TIME METERED RAPID TRANSIT SERVICE - SCHEDULE "TM-RT".............................
Page 12 - 12.1


ELECTRIC VEHICLE SERVICE - SCHEDULE "EV".........................................................
Page 13 13.1


OUTDOOR LIGHTING SERVICE - SCHEDULE "OL" ......................................................
Page 14 - 14.1


STREET LIGHTING SERVICE - SCHEDULE "SL" ...........................................................
Page 15 - 15.1


SERVICING STREET LIGHTS SERVED FROM OVERHEAD LINES -
SCHEDULE "SSL-OH" ................................................................................................
Page 16 - 16.2


SERVICING STREET LIGHTS SERVED FROM UNDERGROUND
LINES - SCHEDULE "SSL-UG" ..................................................................................
Page 17 - 17.2
Electric--P.S.C. Md. No. 1
MD
Fifty-First Revised Page No. 2.1

Date of Issue: July 9, 2008
Date Effective: Usage on and after

September
1,
2008




TELECOMMUNICATIONS NETWORK SERVICE - SCHEDULE "TN".............................
Page 18 - 18.1


COGENERATION AND SMALL POWER PRODUCTION INTERCONNECTION
SERVICE - SCHEDULE "CG-SPP" PURCHASE OF POWER ...................................
Page 19 - 19.4

STANDBY SERVICE - SCHEDULE "S" ............................................................................
Page 20 - 20.1

RESERVED FOR FUTURE USE....................................................................................... Page 21 26
RIDERS
MARKET PRICE SERVICE - RIDER "MPS" ..................................................................... Page 27 - 27.1

(THIS RIDER HAS BEEN DELETED)

UNIVERSAL SERVICE CHARGE RECOVERY - RIDER "USC" ......................................
Page 28

GENERATION PROCUREMENT CREDIT - RIDER "GPC" .............................................
Page 29 - 29.1

EXPERIMENTAL RESIDENTIAL ELECTRIC VEHICLE SERVICE -
RIDER "R-EV" .............................................................................................................
Page 30

EXPERIMENTAL RESIDENTIAL TIME-OF-USE ELECTRIC VEHICLE
SERVICE - RIDER "R-TM-EV"....................................................................................
Page 30.2

BIOMASS, SOLAR AND WIND ELECTRIC GENERATION SERVICE-RIDER "BSWEG"
Page 31 - 31.1

EXPERIMENTAL CONJUNTIVE BILLING SERVICE RIDER CBS ............................. Page
32 32.1

(THIS RIDER HAS BEEN DELETED)

TELECOMMUNICATION NETWORK CHARGE - RIDER "SL-TN" ..................................
Page 33

POWER FACTOR - RIDER "PF" .......................................................................................
Page 34

THERMAL ENERGY STORAGE SERVICE - RIDER "TS" ...............................................
Page 35

DELIVERY TAX SURCHARGE - RIDER "DT" ..................................................................
Page 36

MONTGOMERY COUNTY SURCHARGE - RIDER "MCS"..............................................
Page 37

MARYLAND ENVIRONMENTAL SURCHARGE - RIDER "MES".....................................
Page 38

TEMPORARY TAX COMPLIANCE SURCHARGE - RIDER "TTCS"................................ Page 39

(THIS RIDER HAS BEEN DELETED)

OPTIONAL METER EQUIPMENT RELATED SERVICES - RIDER "OMRS"..
Pages 40 40.2

EXCESS FACILITIES - RIDER "EF"..................................................................................
Page 41

DIVESTITURE SHARING CREDIT - RIDER "DS".........................................................
Page 42


STANDARD OFFER SERVICE - RIDER SOS.. Page 43 43.6

ADMINISTRATIVE CREDIT RIDER AC..
Page 44

Electric--P.S.C. Md. No. 1
MD
Eighteenth Revised Page No. 2.2

Date of Issue: July 9, 2008
Date Effective: Usage on and after

September
1,
2008


SOS PHASE IN CREDIT/DEFERRED COST ADJUSTMENT RIDER SOSPIC/DCA. Page 45 45.1
RESERVED DELIVERY CAPACITY SERVICE RIDER RDCS. Page 46 46.1
BILL STABILIZATION ADJUSTMENT RIDER BSA ...
Page 47
DEMAND-SIDE MANAGEMENT SURCHARGE RIDER DSM .
Page 48 48.1
RESIDENTIAL DIRECT LOAD CONTROL RIDER R-DLC ...
Page 49 49.1
Electric--P.S.C. Md. No. 1
MD - R
Fourteenth Revised Page No. 3

Date of Issue: May 15, 2008
Date Effective: Usage on and after

June
16,
2008




RESIDENTIAL SERVICE
SCHEDULE "R"

AVAILABILITY
Available for Distribution Service and Standard Offer Service when modified by Rider SOS in the
Maryland portion