Microsoft Word - PLUMBING PERMIT 8-2008 Page 1 of 2

200 S. Anaheim Blvd., Suite 145 Anaheim, California 92805 (714)765-5153 Phone (714)765-4607 Fax www.anaheim.net/building
AUGUST 2008
B714



C
ITY OF
A
NAHEIM

PLANNING DEPARTMENT

BUILDING DIVISION


P
LUMBING
P
ERMIT
A
PPLICATION


DATE:

PROJECT ADDRESS:

DESCRIBE WORK TO BE DONE:

WORK BEING DONE IN CONJUNCTION WITH BUILDING PERMIT #:

PRINT YOUR NAME:

I am the:
Property Owner

Contractor
Employee of:
_____Owner _____Contractor
*Verification of Workers Comp. Required
PROPERTY OWNER:
Name:

Address:

Phone Number:

CONTRACTOR:
Company Name:

Address:

City:

Phone Number:

State License #:

City License #:

WORKERS COMPENSATION CERTIFICATE:
Policy #:

Name:


Exempt, No Employees

WRITE QUANTITY In Box Next To Item(s) To Be Included In Permit.
Minimum Permit Fee
$136.73
Supplemental Permit Fee
$34.20
Plan Check Service (per hour)
$172.39

FIXTURES
Fee
Quantity

Fee
Quantity
Sub
Total
Bath Tub
$34.20
Dishwasher
$34.20


Shower $34.20

Washing Machine Rough
$34.20


Lavatory $34.20
Laundry
Tray
$34.20


Water Closet
$34.20
Water
Heater
$57.00


Urinal $34.20
Water
Softener
$68.40


Kitchen Sink
$34.20
Bar
Sink
$34.20


Garbage Disposal
$34.20
Drinking
Fountain
$34.20


Repair/Alteration of Drainage/Vent Piping
$45.60

Water Distribution (modify existing)
$79.80


ADDITIONAL FIXTURES
Fee
Quantity

Fee
Quantity

Floor Drain
$34.20

Backflow 2 in. or less
$34.20


Floor Sink
$34.20

Backflow over 2 in.
$45.60


Service, Mop, Slop Sink
$34.20
Solar
Panel
$68.40


Grease Interceptor/Trap
$45.60
Solar
Storage
$68.40


Sand Interceptor, Trap
$45.60
Rainwater,
Overflow
Drains
$34.20


Boiler up to 15 h.p.
$34.20
Miscellaneous
Fixtures
$34.20


Boiler over 15 h.p.
$68.40





PLUMBING SYSTEMS
Fee
Quantity

Fee
Quantity

Gas Systems (up to 5 Outlets)
$79.80
Sewer
Closure

$45.60


Additional Outlets (each)
$22.80

Private
Sewage Disposal
$114.00


Lawn Sprinklers (up to 5 Valves)
$34.20

Gray water Systems
$136.73


Additional Valves (each)
$4.56

Gas Yard Piping
$79.80


Water Main per 100 ft.
$34.20





Sewer first 100 feet
$34.20





Additional sewer per 100 feet (each)
$22.80





RECLAIMED WATER SYSTEMS
Fee
Quantity



Initial Installation and Testing
$136.73










TOTAL

MAXIMUM CREDIT CARD TRANSACTION IS $2,000

The above schedule covers most common and straight forward permit types. Fees for projects outside of the listed items shall be estimated by the Building
Official based on degree of complexity and size. In addition, the Building Official may require a specific amount into a Building Division Depositor's Trust
Fund (DTF) account in advance of the Building Division processing a request for regulated activities. These projects will be processed in accordance with
procedures outlined in Resolution No. 2008-110. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building
Official and/or as specified in Resolution 2008-110. Page 2 of 2

200 S. Anaheim Blvd., Suite 145 Anaheim, California 92805 (714)765-5153 Phone (714)765-4607 Fax www.anaheim.net/building
AUGUST 2008
B714



CITY OF ANAHEIM PLUMBING REQUIREMENTS
G
AS
P
IPING


Isometric gas piping drawings are required for new construction in all occupancies. Submit to plumbing plan
check for approval.
Gas lines to a single gas appliance, connected directly to the meter will not require isometric drawings. Field
inspector will review on site.
Adding additional gas appliances to an existing gas system will require an approved isometric drawing showing
all b.t.u. demands, appliance locations, all pipe sizes, and developed lengths. Sample gas drawing available
on request.
P.V.C. piping is not approved for gas lines per the 2007 C.P.C. Section 1209.5.4.
Gas lines are not permitted under a concrete slab of a building or a covered patio.
When polyethylene gas pipe is used, Certification by a certified installer is required.

S
HOWER
V
ALVES
P
ER THE
2007

C.P.C.

S
ECTION
418.0

Shower and tub-shower combination shall be provided with individual control valves of the pressure balance
type or with thermostatic mixing valve type.

W
ATER
H
EATERS
P
ER THE
2007

C.P.C.

S
ECTION
505.4,

505.5,

505.6,

508.2
AND
608.5

Gas storage-type water heater shall be provided with a combination temperature and pressure relief valve.
Relief valve on water heaters located inside a building shall be provided with a drain, not smaller than the relief
valve outlet, of galvanized steel, hard drawn copper piping and fittings, CPVC or listed relief valve drain tube.
The drain shall extend from the valve to the outside of the building with the end of the pipe not more than two
feet or less than six inches above the ground and pointing downward. No part of such drain pipe shall be
trapped and the terminal end of the drain pipe shall not be threaded.
All water heaters shall be braced, anchored, or strapped to resist falling or horizontal displacement due to
earthquake motion. If a tank is sitting on a platform, the platform shall be secured to the wall or the floor.
Installation instructions must be supplied by the manufacturer, or the appliance supplier. Several methods and
hardware are approved to meet the requirements.

The following are the most common procedures:
1.

Plumbers Tape- Using 24 gauge tape, wrap two bands around the water heater twice, (one on top,
one on the bottom) in alternate directions and bolt to the wall with ¼ x 3 lag screws. The top wrap
shall be approximately 9 from the top of the tank and the bottom wrap shall be approximately 4
above the gas valve on the water heater tank.
2.

Thinwall Conduit- Wrap a single band of 24 gauge plumbers tape around the tank approximately 9
from the top and approximately 4 above the gas valve and bolt the ends of the tape together with a
¼ x 1 bolt and washers. Flatten the ends of the thinwall conduit and drill holes for ¼ bolts, bolt
the thinwall to the band of tape. Bolt the other end to the wall studs or blocking with a ¼ x 3 lag
screw.
3.

Other hardware has been designed and approved and shall be installed per manufacturers
instructions.

Refer to the booklet supplied by the manufacturer with the water heater for more detailed instructions.