ANTENNA MECHANICAL MAINTENANCE SCVLBA 4/04-22/05 APEX INSPECION: FRM 2 ...

lists.pdf. It's a snapshot of the page taken as our search engine crawled the Web.
The web site itself may have changed. You can check the current page or check for previous versions at the Internet Archive. Yahoo! is not affiliated with the authors of this page or responsible for its content.
ANTENNA MECHANICAL MAINTENANCE SCVLBA 4/04-22/05 APEX INSPECION: FRM 2-YEAR INSPECTION PM. Well lubricated. BALANCE


ANTENNA MECHANICAL MAINTENANCE SCVLBA 4/04-22/05

APEX INSPECION:
FRM 2-YEAR INSPECTION PM. Well lubricated.
BALANCE

AND REPAIR FRM

TUBE
. Done, replaced counter weights. Repaired SW INA---
Bearing segment which had broken bolts. Replaced INA cap ring bearing seal.

FRM INA BEARING CHECK 50 LBS PULL ON EAST MOTOR
East Travel: +.002 West Travel: .000

FRM INA BEARING CHECK 50 LBS PULL ON WEST MOTOR
East Travel: -.002 West Travel: +.001


SUBREFLECTOR INSPECTION: Delaminatingthin in spots (spongy).
Mounting Hardware. OKReplaced 1 turn buckle.
Dipole. OKLooks good.
Peeling paint/delaminating. Needs to be redone, reflector is soft in some places.
Drill

3-1 inch

drain

holes
. Done.

QUAD LEGS INSPECTION:
Guy wires. Surface Rust.
Turn buckles. Surface Rust.
Quad leg flange bolts. OK, minor superficial rust. Bottom ½ of bolts replaced.
REPAIR

CORROSION

AFFECTED

AREAS
. All 4 patchedLadder leg the worst. Clean out rust &
Pant with rust bullet.

DISH INSPECTION:
Anemometer mounts/operation. OK.
Panel surfaces. Overall OK, Some paint degradation.
Spot check panel bolts. Done, Reset ladder leg panel.


FEED CONE INSPECTION:
Feed cone surface/insulation. Ok.
FE feed windows. OK, sealed w/caulk.
FE feed mounting hardware. OK.
Seal and Paint. (
Leak

between

FC

&

VTX
). Done, gallons elastomeric & 2 cases of caulk.
Dichroic reflector cracking/delaminating. (
NOP#6E5C
) Good shape, Replaced 2 eye bolts & aligned
Ellipsoid dish/mount. Replaced ellipsoid actuator and realigned dish.
FC hatch latches replace as needed. All OK.

ANTENNA MECHANICAL MAINTENANCE SCVLBA 4/04-22/05

ELEVATION BEARING/AXLE INSPECTION:
EL. Grease inspection/Encoder side OK
EL. Grease inspection/DGB side
OK
Cable Wraps Brackets. Replaced uni-strut brackets on both sides.
Grease elevation bearings. Well lubricated.
Check elevation axle for cracks. Welded a small crack on the HVAC side.
Listen for popping or grinding. No popping or grinding noises noted.


ELEVATION BULL/PINION GEAR INSPECTION:
Bull gear. Well lubricated and signs of adverse wear.
Bull gear welds/hardware. Welds and hardware OK.
Pinion gears. Well lubricated and no signs of adverse wear.
Lube bull/pinion gears as needed. Previously done by site techs.
Check stow pin. Good shapereplaced lock pin with new.


ELEVATION MOTOR AND GEARBOX INSPECTION:
EL.#1 seals/coupling/internal gears. Done.
EL.#2 seals/coupling/internal gears. Done.
Gearbox heaters/lube pumps. Done.
Flow gauges/fish eyes. Cleaned flow gauges and replaced fish eyes.
Change gearbox oil. Done.
Listen for popping or grinding. No popping or grinding noises notes.
Replace

motor

air

boxes
. Done.

ELEVATION PLATFORM INSPECTION:
Swinging catwalk. Check out OK.
Hoist. Checked OK.
Install (VTX AC platform). Ran out of time(low priority).
REPAIR

&

PAINT

CORROSION

AFFECTED

AREAS
. Spot chipped & painted w/rust bullet.

ANTENNA STRUCTURAL INSPECTION:
Spot-check structural bolts. Rusty, Spot chipped bad bolts and painted w/rust bullet.
VTX walk way. Ok, repainted.
Antenna structural welds. (
REPAIR

&

PAINT

CORROSION

AFFECTED

AREAS
). Spot chipped
Antenna backup/lower structure. And painted with rust bullet.


ANTENNA MECHANICAL MAINTENANCE SCVLBA 4/04-22/05

AZIMUTH BEARING/GREASE INSPECTION

INNER
OUTER
D1 OK
OK
D2 Sight scratches while probing bearing
OK
I1 OK
Little metal in grease w/bearing scratches
I2 OK
OK




AZIMUTH WHEEL INSPECTIONS:
Wheel to structure clearances. Good clearance on all wheels.
Listen for popping or grinding. No popping or grinding noted except on Idler #1 on the 99
th
bolt.


AZIMUTH WHEEL RADIUS/ALIGNMENT
Measured
Specified
D1
D2
Horizontal
0.00.00 (<124)

Vertical
93.26.23(+/-124)


Radius
300.000 (+/-.25)



AZIMUTH MOTOR AND GEARBOX INSPECTION:
AZ#1 seals/coupling/internal gears. Done.
AZ#2 seals/coupling/internal gears. Done.
Gearbox heaters/lube pumps. Done Ok.
Flow gauges/fish eyes. Replaced oil pump seal on #1. Cleaned flow gauges and replaced fish eyes.
Change gearbox oil. Done.
Listen for popping or grinding. No grinding or popping noted.
Replace motor air boxes. Done.

PINTLE BEARING INSPECTION:
Cable wrap & cables. OK
Check for loose bolts. OK
Check bearing grease. OK well lubricated.




ANTENNA MECHANICAL MAINTENANCE SCVLBA 4/04-22/05

AZIMUTH RAIL INSPECTION:
Rail level measurements. Done.
Excessive rail movement. Donenone.
Joint bars and clips. Done.
Antenna foundation/grout/vulchem. Grout is in good shape----vulchem is removed.
Re-torque rail splice plates as needed. Done.


ANTENNA PAINT/INSULATION INSPECTION:
Antenna paint condition. Bad, spot chipped, spot painted w/rust bullet.
Repair antenna insulation as needed. Good shape.


MECHANICAL MAINTENANCE ITEMS TO BE COMPLETED:
1.
Replace

ellipsoid

actuator
. Done, and aligned.
2.
Spot

Seal

and

Paint

Feed

with

Elastomeric
. Done, used 5gallons of paint & 2 cases of caulk.
3.
Repair

&

Paint

Antenna

structure

as

needed
.(
Leak

between

VTX

&

FC
). Repaired.
4.
Replace

and

repair

both

Elevation

cable

wraps
. Donew/stainless uni-strut.
5.
Install

antenna

AC

outlets

above

AZ

motors
. Done.
6.
Install

VTX

compressor

platform
. Platform left behind for future install.
7.
Replace

VTX

door

& strip

above

door
. Door left behind for future install.
8.
Replace

motor

air

boxes
. All 4 done.

ANTENNA MECHANICS NOTES:

Painted all patches w/rust bullet.
Replaced 9 bolts per quad leg.
Patched quad legs, Ladder leg above and below dish surface.
Reworked walkway and railing above ped room. Replaced cable tray.
Repaired pockets and 6 pieces of grating on both elevation platforms.
Replaced gate to cat walk.
Used 2 gallons of rust bullet and 3 gallons of paint.








ANTENNA SERVO MAINTENANCE SCVLBA 4/04-22/05

ANTENNA SAFETY TESTS:
Ped Room Electrical Panel Inspections. ½ done, no time to finish.


BRAKE HOLDING-TORQUE TESTS ( FT-LBS)
AZ #1
Motor replaced w/ new air boxes.
AZ #2
82lbs
EL #1
74lbsReplace brake pads and adjusted block.
EL #2
Motor replaced w/ new air boxes.

MOTOR INSPECTIONS:
Elevation motor/tach couplings.Tight.
Elevation brush/commutator. Some wearreplaced brushes on EL #1.
Azimuth motor/tach couplings. Tight.
Azimuth brush/commutator. Some wear----replaced brushes AZ#2
Install new design air boxes. Done.

ANTENNA GROUNDING INSPECTION:
Elevation ground cable. Replaced both Elevation grounds.
Elevation platform to pintle turret. Replaced cable tray.
Pedestal room. Good.
Azimuth wheel contacts. Good.
Pintle room/cable wrap. Added Teflon to wrap.
Apex/Dish lightning rods. Replaced ground to cable wrap.

SERVO RECORDINGS:
Elevation response test. Timed and adjusted DB interface boards.
Azimuth response test. Timed and adjusted DB interface boards.
Elevation position loop test. No time to complete.
Azimuth position loop test. No time to complete.


ACU AUTO MODE TESTS:
System/axis faults. Ok
AZ/EL motor fault status. OK
Stow commands. OK
Synchro position feedback. OK
VME to ACU communication. OK
Restore ACU parameters. OK.
ANTENNA SERVO MAINTENANCE SCVLBA 4/04-22/05

SERVO MAINTENANCE ITEMS TO BE COMPLETED:
1.
Install

Digital

tachs

on

both

axis
.
Done and calibrated.
2.
Install

New

ACU

Back

plane
. Done and tested.
3.
Install

Drive

Cabinet

power

supply

Mod
. No time for upgrade.
4.
Spot

Seal

and

Paint

Feed

Cone

with

Elastomeric
. (
Leak

between

VTX

&

FC
). Done.
5.
Replace

Tie

wraps

w/metal

as

needed
. From top to bottom of the antenna.
6.
Install

electrical

outlets

above

AZ1

&

A