ANTENNA MECHANICAL MAINTENANCE SCVLBA 4/04-22/05 APEX INSPECION: FRM 2-YEAR INSPECTION PM. Well lubricated. BALANCE
ANTENNA MECHANICAL MAINTENANCE SCVLBA 4/04-22/05
APEX INSPECION:
FRM 2-YEAR INSPECTION PM. Well lubricated.
BALANCE
AND REPAIR FRM
TUBE
. Done, replaced counter weights. Repaired SW INA---
Bearing segment which had broken bolts. Replaced INA cap ring bearing seal.
FRM INA BEARING CHECK 50 LBS PULL ON EAST MOTOR
East Travel: +.002 West Travel: .000
FRM INA BEARING CHECK 50 LBS PULL ON WEST MOTOR
East Travel: -.002 West Travel: +.001
SUBREFLECTOR INSPECTION: Delaminatingthin in spots (spongy).
Mounting Hardware. OKReplaced 1 turn buckle.
Dipole. OKLooks good.
Peeling paint/delaminating. Needs to be redone, reflector is soft in some places.
Drill
3-1 inch
drain
holes
. Done.
QUAD LEGS INSPECTION:
Guy wires. Surface Rust.
Turn buckles. Surface Rust.
Quad leg flange bolts. OK, minor superficial rust. Bottom ½ of bolts replaced.
REPAIR
CORROSION
AFFECTED
AREAS
. All 4 patchedLadder leg the worst. Clean out rust &
Pant with rust bullet.
DISH INSPECTION:
Anemometer mounts/operation. OK.
Panel surfaces. Overall OK, Some paint degradation.
Spot check panel bolts. Done, Reset ladder leg panel.
FEED CONE INSPECTION:
Feed cone surface/insulation. Ok.
FE feed windows. OK, sealed w/caulk.
FE feed mounting hardware. OK.
Seal and Paint. (
Leak
between
FC
&
VTX
). Done, gallons elastomeric & 2 cases of caulk.
Dichroic reflector cracking/delaminating. (
NOP#6E5C
) Good shape, Replaced 2 eye bolts & aligned
Ellipsoid dish/mount. Replaced ellipsoid actuator and realigned dish.
FC hatch latches replace as needed. All OK.
ANTENNA MECHANICAL MAINTENANCE SCVLBA 4/04-22/05
ELEVATION BEARING/AXLE INSPECTION:
EL. Grease inspection/Encoder side OK
EL. Grease inspection/DGB side
OK
Cable Wraps Brackets. Replaced uni-strut brackets on both sides.
Grease elevation bearings. Well lubricated.
Check elevation axle for cracks. Welded a small crack on the HVAC side.
Listen for popping or grinding. No popping or grinding noises noted.
ELEVATION BULL/PINION GEAR INSPECTION:
Bull gear. Well lubricated and signs of adverse wear.
Bull gear welds/hardware. Welds and hardware OK.
Pinion gears. Well lubricated and no signs of adverse wear.
Lube bull/pinion gears as needed. Previously done by site techs.
Check stow pin. Good shapereplaced lock pin with new.
ELEVATION MOTOR AND GEARBOX INSPECTION:
EL.#1 seals/coupling/internal gears. Done.
EL.#2 seals/coupling/internal gears. Done.
Gearbox heaters/lube pumps. Done.
Flow gauges/fish eyes. Cleaned flow gauges and replaced fish eyes.
Change gearbox oil. Done.
Listen for popping or grinding. No popping or grinding noises notes.
Replace
motor
air
boxes
. Done.
ELEVATION PLATFORM INSPECTION:
Swinging catwalk. Check out OK.
Hoist. Checked OK.
Install (VTX AC platform). Ran out of time(low priority).
REPAIR
&
PAINT
CORROSION
AFFECTED
AREAS
. Spot chipped & painted w/rust bullet.
ANTENNA STRUCTURAL INSPECTION:
Spot-check structural bolts. Rusty, Spot chipped bad bolts and painted w/rust bullet.
VTX walk way. Ok, repainted.
Antenna structural welds. (
REPAIR
&
PAINT
CORROSION
AFFECTED
AREAS
). Spot chipped
Antenna backup/lower structure. And painted with rust bullet.
ANTENNA MECHANICAL MAINTENANCE SCVLBA 4/04-22/05
AZIMUTH BEARING/GREASE INSPECTION
INNER
OUTER
D1 OK
OK
D2 Sight scratches while probing bearing
OK
I1 OK
Little metal in grease w/bearing scratches
I2 OK
OK
AZIMUTH WHEEL INSPECTIONS:
Wheel to structure clearances. Good clearance on all wheels.
Listen for popping or grinding. No popping or grinding noted except on Idler #1 on the 99
th
bolt.
AZIMUTH WHEEL RADIUS/ALIGNMENT
Measured
Specified
D1
D2
Horizontal
0.00.00 (<124)
Vertical
93.26.23(+/-124)
Radius
300.000 (+/-.25)
AZIMUTH MOTOR AND GEARBOX INSPECTION:
AZ#1 seals/coupling/internal gears. Done.
AZ#2 seals/coupling/internal gears. Done.
Gearbox heaters/lube pumps. Done Ok.
Flow gauges/fish eyes. Replaced oil pump seal on #1. Cleaned flow gauges and replaced fish eyes.
Change gearbox oil. Done.
Listen for popping or grinding. No grinding or popping noted.
Replace motor air boxes. Done.
PINTLE BEARING INSPECTION:
Cable wrap & cables. OK
Check for loose bolts. OK
Check bearing grease. OK well lubricated.
ANTENNA MECHANICAL MAINTENANCE SCVLBA 4/04-22/05
AZIMUTH RAIL INSPECTION:
Rail level measurements. Done.
Excessive rail movement. Donenone.
Joint bars and clips. Done.
Antenna foundation/grout/vulchem. Grout is in good shape----vulchem is removed.
Re-torque rail splice plates as needed. Done.
ANTENNA PAINT/INSULATION INSPECTION:
Antenna paint condition. Bad, spot chipped, spot painted w/rust bullet.
Repair antenna insulation as needed. Good shape.
MECHANICAL MAINTENANCE ITEMS TO BE COMPLETED:
1.
Replace
ellipsoid
actuator
. Done, and aligned.
2.
Spot
Seal
and
Paint
Feed
with
Elastomeric
. Done, used 5gallons of paint & 2 cases of caulk.
3.
Repair
&
Paint
Antenna
structure
as
needed
.(
Leak
between
VTX
&
FC
). Repaired.
4.
Replace
and
repair
both
Elevation
cable
wraps
. Donew/stainless uni-strut.
5.
Install
antenna
AC
outlets
above
AZ
motors
. Done.
6.
Install
VTX
compressor
platform
. Platform left behind for future install.
7.
Replace
VTX
door
& strip
above
door
. Door left behind for future install.
8.
Replace
motor
air
boxes
. All 4 done.
ANTENNA MECHANICS NOTES:
Painted all patches w/rust bullet.
Replaced 9 bolts per quad leg.
Patched quad legs, Ladder leg above and below dish surface.
Reworked walkway and railing above ped room. Replaced cable tray.
Repaired pockets and 6 pieces of grating on both elevation platforms.
Replaced gate to cat walk.
Used 2 gallons of rust bullet and 3 gallons of paint.
ANTENNA SERVO MAINTENANCE SCVLBA 4/04-22/05
ANTENNA SAFETY TESTS:
Ped Room Electrical Panel Inspections. ½ done, no time to finish.
BRAKE HOLDING-TORQUE TESTS ( FT-LBS)
AZ #1
Motor replaced w/ new air boxes.
AZ #2
82lbs
EL #1
74lbsReplace brake pads and adjusted block.
EL #2
Motor replaced w/ new air boxes.
MOTOR INSPECTIONS:
Elevation motor/tach couplings.Tight.
Elevation brush/commutator. Some wearreplaced brushes on EL #1.
Azimuth motor/tach couplings. Tight.
Azimuth brush/commutator. Some wear----replaced brushes AZ#2
Install new design air boxes. Done.
ANTENNA GROUNDING INSPECTION:
Elevation ground cable. Replaced both Elevation grounds.
Elevation platform to pintle turret. Replaced cable tray.
Pedestal room. Good.
Azimuth wheel contacts. Good.
Pintle room/cable wrap. Added Teflon to wrap.
Apex/Dish lightning rods. Replaced ground to cable wrap.
SERVO RECORDINGS:
Elevation response test. Timed and adjusted DB interface boards.
Azimuth response test. Timed and adjusted DB interface boards.
Elevation position loop test. No time to complete.
Azimuth position loop test. No time to complete.
ACU AUTO MODE TESTS:
System/axis faults. Ok
AZ/EL motor fault status. OK
Stow commands. OK
Synchro position feedback. OK
VME to ACU communication. OK
Restore ACU parameters. OK.
ANTENNA SERVO MAINTENANCE SCVLBA 4/04-22/05
SERVO MAINTENANCE ITEMS TO BE COMPLETED:
1.
Install
Digital
tachs
on
both
axis
. Done and calibrated.
2.
Install
New
ACU
Back
plane
. Done and tested.
3.
Install
Drive
Cabinet
power
supply
Mod
. No time for upgrade.
4.
Spot
Seal
and
Paint
Feed
Cone
with
Elastomeric
. (
Leak
between
VTX
&
FC
). Done.
5.
Replace
Tie
wraps
w/metal
as
needed
. From top to bottom of the antenna.
6.
Install
electrical
outlets
above
AZ1
&
A