ANNUAL TOWER INSPECTION REPORT
Wisconsin Department of Transportation
SP4599 9/2007
Tower Site Name
Date Inspected
BULB REPLACEMENT shall be performed for every incandescent
beacon and obstruction lamp for each tower. Replacement shall
be performed in conjunction with the tower and lighting inspection.
Strobes and LED lighting shall only be replaced as needed. Contractor
shall use only new, high-grade bulbs with Pyrex glass, long life, 130
volt rating. No reimbursement will be made to Contractor for bulbs installed during
the bulb change.
Indicate quantity and type
of lamp (incandescent, LED or strobe) used on each tower.
Beacon Quantity and Type
Obstruction Quantity and Type
TEST TOWER LIGHTING CONTROLLER AND ALARM SYSTEMS
Satisfactory
Unsatisfactory
Darken photocell to verify night-mode lighting
activation
Proper flashing or strobe of beacons and steady
illumination of all obstruction lights
Daytime lighting is functioning properly, where
applicable
Alarm system detects failure of tower lighting,
as applicable at each tower site
Lighting Controller Model
Number
Controller Serial Number
ELECTRICAL AND LIGHTING INSPECTIONS
Satisfactory
Unsatisfactory
Proper functioning of photocell
Proper functioning of flasher
Proper functioning of ALL bulbs after replacement
Inspect for damaged red obstruction lens
Inspect for damaged ruby liner and clear glass
lens in beacon
Functioning of strobe light, if applicable
All strobe lights are working
Tower lighting electrical system
Junction box wiring and bulb sockets at all points
above the photocell, specifically:
Tightness of electrical screw terminals Tighten
loose connections
Deterioration of insulation of electrical wiring
Evidence of overheating of electrical wiring
Bulb sockets condition Number of sockets replaced:
Inspect and record incandescent
lamp voltage at all sockets under load.
Socket
1
Socket
2
Socket
3
Level 1
Level 2
Level 3
Level 4
TOWER INSPECTION
Satisfactory
Unsatisfactory
Attachment and physical
condition of antennas and transmission lines
Site deterioration or
vandalism
Proper conduit attachment
- Repair or replace defective conduit attachments
Paint fading to be checked
with the In-service Aviation Orange Color Tolerance Chart
Paint Good
Paint OK
Needs Painting
Guy anchor condition and
integrity including turnbuckles, wire rope clamps and nuts and safety
cable through all turnbuckles; Inspect for sagging, rust