Pre-Engineered Pump Stations

lpadding=7 cellspacing=0 width=100% bgcolor=ccccff> « back to results for ""
Below is a cache of http://www.romtecutilities.com/.docs/pg/400/rid/10142/f/Romtec_Utilities_Catalog_2008.pdf. It's a snapshot of the page taken as our search engine crawled the Web.
The web site itself may have changed. You can check the current page or check for previous versions at the Internet Archive. Yahoo! is not affiliated with the authors of this page or responsible for its content.
Pre-Engineered Pump Stations
Pre-Engineered Pump Stations
Dedicated Integrator
Wastewater

Stormwater

Industrial
Federal Supply Schedule
Contract No. GS-07F-9402S Pre-Engineered

pump systems
Federal Supply Schedule
Contract No. GS-07F-9402S
Federal Supply Schedule
Contract No. GS-07F-9402S
Industrial
Wastewater
Stormwater
2 Complete Pumping Solutions
ALL Structural

ALL Mechanical


ALL Electrical



ALL Communication
Pre-cast wet well: 4, 5, 6, 8 & 10 dia.,
10 to 40 deep
Pre-cored concrete, choice of lining/seal
coating
Control building/weather shelter
ITT Flygt & Goulds pumps
UL listed SCADA
Cummins generator
Odor control system
Quick Quoting!
Submittals
Site plan review
Size your pump station
and get a quote!
Call
541-496-9678 or visit www.RomtecUtilities.com
3
100% responsibility for
the entire lift station! WASTEWATER

lift station systems
Residential Development
4 Precast Wet Wells
Meet the flow requirement for your project
Precast concrete 4, 5, 6, 8, 10 ID
Wet Well Features
4 to 40 depths
Available full exterior seal coating
Lined or unlined
Access cover load designs:
pedestrian or traffic-rated
Disconnect panel or in-ground
junction box
Choice of: pressure transducer,
ultrasonic, probes, floats
5
Standard wet well top
Custom wet well top
Exterior Seal
Coating
Ready for delivery
and installation
10 ID
6 ID
Wet well
interior
5 WASTEWATER

lift station systems
Industrial Park
Residential Infill
6 Pumps
Choice of Liquid Level Sensors

Romtec Utilities integrates your choice of liquid

level-sensing system to conform to your specifications.


Floats


Ultrasonic


Pressure Transducer


Probes
Get Started Today!
Call
541-496-9678 or visit
www.RomtecUtilities.com
Floats
Ultrasonic
Pressure
Transducer
Probe
Pump Connection Choices
Three ways to connect and disconnect pumps and controls.
Easy
installation
and removal
of pumps
Submersible pumps 2hp to 250hp
Control panel
connections
Cable hatch & pump disconnect panel
Junction box
7 Get your project started today!
www.RomtecUtilities.com
Click on
Request a Quote
WASTEWATER

lift station systems
Future Expansion
Environmental
Protection
Use our
easy on-line
sizing system! Fully Pre-assembled and Tested
Flow Metering
Wastewater collection agencies may require flow metering
for billing and planning. A pre-assembled flow meter vault
is installed downstream from the valve vault.
Flow meter generates a magnetic field to measure flow
within 0.5% accuracy.
Flow data transmitter is located in lift station control panel.
Pre-cast Concrete Vaults
Double access doors
Pre-assembled Components
Check valves
Operational isolation valves
Pressure guages
Simplex, Duplex & Triplex
2, 4, 6, 8, 10 discharge
Options
Bypass pumping
Pigging port
Digital pressure sensor
with reporting function
Sump pump
Ladder
Fall control
Duplex 4 valve vault with pressure sensor (left)
Triplex 10 valve vault
with bypass pumping
port (above) and sepa-
rate pressure sensors
on each incoming line
(right).
4 flow metering vault with bypass line.
Flow data transmitter
Prefabricated Valve
and Metering Vaults
Complete system with flow metering STORMWATER

pumping systems
10
Municipal Drainage Control Basic to Full SCADA We do it all!
Every Romtec Utilities pump station has a UL listed Control Panel.
We offer technologies from top manufacturers, and we work closely
with local agencies and engineers to configure controls as required.
Control Panel Features
All NEMA-rated enclosures
Completely pre-assembled,
drawings included
Choice of controllers: ITT Flygt,
PLC, alternators, others
Choice of telemetry: phone,
radio, cellular
Generator connection and
manual transfer switch, optional
automatic transfer switch to
on-site generator
Roomy interior for future
upgrades
Service-rated entrance switch
Convenience light, power outlet
Redundant high-level alarm
Elapsed time meters
Optional soft starters
Optional VFDs
SCADA / Alarming
Fast and efficient alarms
Complete lift station data and control
Periodic reports: run times, number
of starts, inflow and outflow volumes,
alarm log
We meet the spec!
Call
541-496-9678 or visit
www.RomtecUtilities.com
Duplex control panel with Flygt APP521 controller
Triplex control panel with alternator pump controls
Control Panels
& SCADA
11
Municipal/PublicWorks
Residential
Commercial
Industrial
Environmental
Transportation
Power Generation
Manufacturing
Agriculture
Mining
Military
Biofiltration
Underpass Flood Control 12
STORMWATER

pumping systems
Site Remediation
Pollution Control The Right
Generator
Diesel
Natural gas
Propane
20 Kw to 200 Kw
Reliable standby power
Portable trailer-mounted unit (top)
On-site generator in QuietSite II
enclosure for sound attenuation
down to 66dB (right)
Automatic transfer switch (below)
Romtec Utilities coordinates all aspects of
lift station start-up, including comprehensive
testing by field technicians.
Cummins
Generators INDUSTRIAL

pump systems
Power Generation
Lagoons
Power Generation
Site Remediation
Process Water Request a Quote!
Call
541-496-9678 or visit
www.RomtecUtilities.com
Weve got you covered!
Many sizes and styles
Designs meet codes in all 50 states
Fast installation
Custom designs to your spec
Available equipment:
- eye wash sink
- emergency shower
- custom lighting
- special doors
- HVAC
Prefabricated Steel
Sun Shade
Solid Concrete
Control Buildings
Control Buildings & Shelters
15 Federal Supply Schedule
Contract No. GS-07F-9402S
ALL Structural ALL Mechanical
ALL Electrical ALL Communication
WASTEWATER
STORMWATER
INDUSTRIAL
COMPLETE SYSTEMS
Pre-Engineered Pump Stations
Wastewater Stormwater Industrial
541-496-9678 info@romtecutilities.com