WISCONSIN PUBLIC SERVICE CORPORATION MPSC Vol No 5-ELECTRIC Original ...
ccccff>
« back to results for ""
Below is a cache of http://www.wisconsinpublicservice.com/news/elecMI/EC4.pdf. It's a snapshot of the page taken as our search engine crawled the Web.
The web site itself may have changed. You can check the current page or check for previous versions at the Internet Archive.
Yahoo! is not affiliated with the authors of this page or responsible for its content.
WISCONSIN PUBLIC SERVICE CORPORATION MPSC Vol No 5-ELECTRIC Original Sheet No. C-29.00 (Reformatted Rate Book)
WISCONSIN PUBLIC SERVICE CORPORATION
MPSC Vol No 5-ELECTRIC Original Sheet No. C-29.00
(Reformatted Rate Book)
C4. Standard Rules & Regulations-Construction Policy
RIIIM
SECTION IV. CONSTRUCTION POLICY
This section of the rules and regulations sets forth the terms and conditions
under which the company will construct and extend its facilities to serve new
loads and replace, relocate, or otherwise modify its facilities.
Except where specifically stated otherwise, service extension policy is based on
overhead construction, and any financial participation by the customers for
underground facilities shall be in addition to other charges provided for in
these rules.
Contributions in aid of construction and other deposits made with the company
under the provisions of this section shall be considered nonrefundable, except
where provisions for refunds are specifically stated. No refunds will be made
in excess of the refundable amount deposited, and deposits shall not bear
interest. Refunds, where applicable, will be made in accordance with the terms
stated hereinafter.
Each distribution line extension shall be a separate distinct unit and any
further extension therefrom shall have no effect upon the agreements under which
such extension is constructed.
Continued to Sheet No. C-30.00
Issued:
02-19-08
Effective
for
Service
By
J
F
Schott
On
and
After:
10-10-07
VP
Regulatory
Affairs
Issued
Under
Auth.
of
Green
Bay,
Wisconsin
Mich
Public
Serv
Comm
Dated:
10-09-07
In Case No: U-15152
WISCONSIN PUBLIC SERVICE CORPORATION
MPSC Vol No 5-ELECTRIC Original Sheet No. C-30.00
(Reformatted Rate Book)
C4. Standard Rules & Regulations-Construction Policy
RIIIM
Continued from Sheet No. C-29.00
1.
OVERHEAD EXTENSION POLICY
a. Residential
Service
1) Charges
For each permanent year-round dwelling, the company will provide
a single-phase line extension, excluding service drop, at no
additional charge for a distance of 600 feet of which no more
than 200 feet is a lateral extension on the customer's private
property. For each permanent seasonal-type dwelling, the company
will provide at no extra charge a 200-foot extension from a main
line distribution feeder. Distribution line extension in excess
of the above footages will require an advance deposit equal to
the actual costs for the portion of the line extension in excess
of above footages. There will also be a nonrefundable
contribution equal to the cost of right-of-way and clearing on
such excess footage. Three-phase extensions will be on the same
basis as commercial and industrial.
2) Measurement
The length of any main line distribution feeder extension will be
measured along the route of the extension from the company's
nearest facilities from which the extension can be made to the
customer's property line. The length of any lateral extension on
the customer's property shall be measured from the customer's
property line to the service pole. Should the company for its
own reasons choose a longer route, the applicant will not be
charged for the additional distance. However, if the customer
requests special routing of the line, the customer will be
required to pay the extra cost resulting from the special
routing.
3) Refunds
During the five (5) year period immediately following the date of
payment, the company will make refunds of the charges paid for a
financed extension under provisions of Paragraph 1) above. The
amount of any such refund shall be $500 for each permanent
electric service subsequently connected directly to the
facilities financed by the customer. Directly connected
customers are those which do not require the construction of more
than 300 feet of lateral primary distribution line. Such refunds
will be made only to the original customer if still receiving
service at the same location and will not include any amount of
contribution in aid of construction for underground service made
under the provisions of the company's underground service policy
as set forth in this section. The total refund shall not exceed
the refundable portion of the contribution.
Continued to Sheet No. C-31.00
Issued:
02-19-08
Effective
for
Service
By
J
F
Schott
On
and
After:
10-10-07
VP
Regulatory
Affairs
Issued
Under
Auth.
of
Green
Bay,
Wisconsin
Mich
Public
Serv
Comm
Dated:
10-09-07
In Case No: U-15152
WISCONSIN PUBLIC SERVICE CORPORATION
MPSC Vol No 5-ELECTRIC Original Sheet No. C-31.00
(Reformatted Rate Book)
C4. Standard Rules & Regulations-Construction Policy
RIIIM
Continued from Sheet No. C-30.00
b.
Commercial or Industrial Service
1) Company-Financed
Extensions
Except for contributions in aid of construction for underground
service made under the provisions of Section III., 2), of these
rules, the company will finance the construction cost necessary
to extend its facilities to serve commercial or industrial
customers when such investment does not exceed two (2) times the
annual distribution service revenue anticipated to be collected
from customers initially served by the extension.
2) Charges
When the estimated cost of construction of such facilities
exceeds the company's maximum initial investment as defined in
Paragraph 1), the applicant shall be required to make a deposit
in the entire amount of such excess construction costs. Owners
or developers of mobile home parks shall be required to deposit
the entire amount of the estimated cost of construction, subject
to the refund provisions of Paragraph 3).
3) Refunds
That portion of the deposit related to the difference in the cost
of underground construction and the equivalent overhead
facilities shall be considered nonrefundable. This amount shall
be determined under applicable provisions of the company's
underground service policy as set forth in this section.
The company will make refunds on remaining amounts of deposits
collected, under the provisions of Paragraph 2) above, in cases
where actual experience shows that the electric distribution
service revenues supplied by the customer are sufficient to
warrant a greater initial investment by the company. Such
refunds shall be computed as follows:
a) Original
Customer
At the end of the first complete 12 month period immediately
following the date of initial service, the company will
compute a revised initial investment based on two (2) times
the actual distribution service revenue provided by the
original customer in the 12 month period. Any amount by
which twice the distribution service actual annual revenue
exceeds the company's initial investment will be made
available for refund to the customer; no such refund shall
exceed the amount deposited under provisions of Paragraph 2)
above.
b)
For Additional New Customers
Refunds for additional new customers directly connected to
the financed extension during the refund period will be
governed by Section III., 1., a., 3).
Continued to Sheet No. C-32.00
Issued:
02-19-08
Effective
for
Service
By
J
F
Schott
On
and
After:
10-10-07
VP
Regulatory
Affairs
Issued
Under
Auth.
of
Green
Bay,
Wisconsin
Mich
Public
Serv
Comm
Dated:
10-09-07
In Case No: U-15152
WISCONSIN PUBLIC SERVICE CORPORATION
MPSC Vol No 5-ELECTRIC Original Sheet No. C-32.00
(Reformatted Rate Book)
C4. Standard Rules & Regulations-Construction Policy
RIIIM
Continued from Sheet No. C-31.00
c.
Service Extensions to Loads of Questionable Permanence
When service is requested for loads of questionable permanence, such
as, but not limited to, saw mills, mixer plants, gravel pits, oil
wells, oil facilities, etc., the company will install, own, operate,
and maintain all distribution facilities up to the point of attachment
to the customer's service equ