Application for Electric Standby Service - Form G
NIAGARA MOHAWK POWER CORPORATION
P.S.C. NO. 207 ELECTRICITY
Date of Issue: December 13, 2000
Date Effective: December 29, 2000
Issued by Darlene D. Kerr, Executive Vice President, Syracuse, New York
Issued in Compliance With Order of the Public Service Commission
Issued and Effective November 15, 2000 in Case No. 94-E-0952.
Fifth Revised Leaf No. 77-O24
Superseding Fourth " Leaf No. 77-O24
GENERAL INFORMATION FOR CONNECTION OF ON-SITE GENERATORS
APPLICATION FOR ELECTRIC STANDBY SERVICE
FORM "G"
Date_________________,____
THE UNDERSIGNED (hereinafter called "Customer") hereby applies to NIAGARA
MOHAWK POWER CORPORATION (hereinafter called "Company") to provide Electric
Service at the Service Entrance, including Standby Service pursuant to Rule 12
of the Company's Tariff P.S.C. No. 207 - Electricity ("the Tariff") for 60 Hz
On-Site Generator(s)s (OSG), at approximately___________volts,__(Single)__
(Three) phase for use upon Customer Location (premises) located at:
Name:
______________________________________________________________
Address: ______________________________________________________________
City:
______________________________________________________________
Zip:
_______-_______
State: New York
Premise Number:___________________________________________________________
for and during the period of from ___________,____ as specified as the term of
service required for Customers served pursuant to Service Classification No.
____ of P.S.C No. 207, and thereafter renewed or extended as provided in such
Service Classification, or until superseded by an executed Application for
Standby Service with a successor customer occupying the above identified
premise.
This Service Application supplements but does not supersede any pre-existing
Service Application or Form, executed by the Customer, evidencing the
Customer's acceptance of Electric Service under the Tariff. If the Customer
has not executed a Form or Service Application required by the Tariff under the
Customer's Applicable Service Classification, the Customer must first execute
such Form or Service Agreement before the Company will accept this Form "G".
The Service Entrance or Point of Delivery shall be (insert Pole #, structure #
or other Service Entrance or interconnection point identifier)
____________________________________________________________________________
____________________________________________________________________________
With Credit, Billing and On-site Meter(s) located or installed at (insert
location of metering facilities identifier)
Credit Meter:
___________________________________________
Billing Meter:
___________________________________________
OSG Meter:
___________________________________________
Such metering shall be loss compensated to the Service Entrance or Point of
Delivery identifier by loss compensation factors as follows:
Credit:_________%, Billing:__________%,
OSG:__________%
NIAGARA MOHAWK POWER CORPORATION
P.S.C. NO. 207 ELECTRICITY
Date of Issue: December 13, 2000
Date Effective: December 29, 2000
Issued by Darlene D. Kerr, Executive Vice President, Syracuse, New York
Issued in Compliance With Order of the Public Service Commission
Issued and Effective November 15, 2000 in Case No. 94-E-0952.
Fourth Revised Leaf No. 77-O25
Superseding Third " Leaf No. 77-O25
GENERAL INFORMATION FOR CONNECTION OF ON-SITE GENERATORS
APPLICATION FOR ELECTRIC STANDBY SERVICE
FORM "G" (Continued)
The Customer hereby agrees to provide the Company with sufficient space to
install its meters and metering facilities in locations acceptable to the
Company, and agrees that the Customer's OSG will not be operated until such
meters and metering facilities are installed and operational. In the event the
Customer qualifying under Rule 12.4.2, the Customer agrees to provide the
information necessary to implement Rule 12.4.2.
Transformers are to be supplied, owned and maintained by ____Customer,
____Company (select one).
On-Site Generation Specifics (information to be supplied for each On-Site
Generator Unit:
OSG Unit 1 OSG Unit 2 OSG Unit 3
Date of Installation:
___________ ___________ ____________
Manufacturer of Generator(s):
___________ ___________ ____________
Model(s) Designation:
___________ ___________ ____________
Serial Number(s)
___________ ___________ ____________
Nameplate Output Rating(s):
_________kW _________kW __________kW
Nameplate Output Rating(s):
________kVA ________kVA _________kVA
OSG Type Designators:
Synchronous
___________ ___________ ____________
Induction
___________ ___________ ____________
Inverter
___________ ___________ ____________
Complete or attach as required for Synchronous Generators to be operated in
parallel with the system:
Rated Speed (RPM)
___________ ___________ ____________
Rated Voltage
___________ ___________ ____________
Efficiency
___________ ___________ ____________
Rated Power Factor
___________ ___________ ____________
Locked Rotor Current
___________ ___________ ____________
Winding Connection
(Wye or Delta)
___________ ___________ ____________
Saturation Curve (dwg #) ___________ ___________ ____________
Vee Curve (dwg #)
___________ ___________ ____________
Torque at rated speed
___________ ___________ ____________
Field Amperes
___________ ___________ ____________
Field Resistance Ohms
___________ ___________ ____________
Type of Exciter
___________ ___________ ____________
Voltage Response Curve
(dwg #)
___________ ___________ ____________
Output Power of Exciter
___________ ___________ ____________
Type of Voltage Regulator
___________ ___________ ____________
Xd (direct axis sync.
reactance)
__________
___________ ____________
Xd (transient reactance) ___________ ___________ ____________
Xd (subtran reactance)
___________ ___________ ____________
NIAGARA MOHAWK POWER CORPORATION
P.S.C. NO. 207 ELECTRICITY
Date of Issue: December 13, 2000
Date Effective: December 29, 2000
Issued by Darlene D. Kerr, Executive Vice President, Syracuse, New York
Issued in Compliance With Order of the Public Service Commission
Issued and Effective November 15, 2000 in Case No. 94-E-0952.
Fourth Revised Leaf No. 77-O26
Superseding Third " Leaf No. 77-O26
GENERAL INFORMATION FOR CONNECTION OF ON-SITE GENERATORS
APPLICATION FOR ELECTRIC STANDBY SERVICE
FORM "G" (Continued)
Complete or attach as required for Induction Generators to be operated in
parallel with the System:
OSG Unit 1
OSG Unit 2 OSG Unit 3
Rated Speed (RPM)
___________ ___________ ____________
Rated Voltage
___________ ___________ ____________
Efficiency
___________ ___________ ____________
Rated Power Factor
___________ ___________ ____________
Locked Rotor Current
___________ ___________ ____________
Winding Connection
(Wye or Delta)
___________ ___________ ____________
Rr (Rotor Resistance)
___________ ___________ ____________
Xr (Rotor Reactance)
___________ ___________ ____________
Xm (Magnetizing Reactance
___________ ___________ ____________
Rs (Stator Reactance)
___________ ___________ ____________
Xs (Stator Reactance)
___________ ___________ ____________
Xd (Short Circuit Reactance)
___________ ___________ ____________
Exciting Current
___________ ___________ ____________
Reactive Load @ No Load
(kvar)
___________ ___________ ____________
Reactive Load @ Full Load
(kvar)
___________ ___________ ____________
Frame Size
___________ ___________ ____________
Design Letter
___________ ___________ ____________
Temperature Rise (deg C) ___________ ___________ ____________
Complete or attach as required for Inverters to be operated in parallel with
the System:
Load Ramp speed Watts/min
___________ ___________ ____________
Input Voltage
___________ ___________ ____________
AC Or DC
___________ ___________ ____________
Tolerance %
___________ ___________ ____________
Output Voltage
___________ ___________ ____________
AC Or DC
___________ ___________ ____________
Tolerance %
___________ ___________ ____________
Control Features
___________ ___________ ____________
Isolation Transformer
Rating(VA)
___________ ___________ ____________
Primary Voltage
___________ ___________ ____________
Secondary Voltage
___________ ___________ ____________
% Impedance
___________ ___________ ____________
Filtering Equipment
attach Mfg spec.
NIAGARA MOHAWK POWER CORPORATION
P.S.C. NO. 207 ELECTRICITY
Date of Issue: December 13, 2000
Date Effective: December 29, 2000
Issued by Darlene D. Kerr, Executive Vice President, Syracuse, New York
Issued in Compliance With Order of the Public Service Commission
Issued and Effective November 15, 2000 in Case No. 94-E-0952.
Fourth Revised Leaf No. 7